Bosnia seeks to avert loss of KfW funds in wake of HPP Salakovac project pullout

Bosnia and Herzegovina’s (BiH) Finance and Treasury Minister Vjekoslav Bevanda has organized a meeting with representatives of German development bank KfW and power utility Elektroprivreda BiH (EPBiH) in an attempt to prevent the suspension of multi-million projects in BiH financed by the German government, after EPBiH decided to abandon a project to reconstruct hydropower plant […]

EPCG inks deal for HPP Komarnica preliminary design plan

Montenegro’s electricity company Elektroprivreda Crne Gore (EPCG) has signed an agreement worth over EUR 1.6 million with a group of bidders from Serbia – Jaroslav Černi and Energoprojekt Hidroinženjering – to produce a preliminary design plan for hydropower plant (HPP) Komarnica. The contractors are also to prepare a feasibility study and an environmental impact study, EPCG has […]

Canadian company abandoned Brodarevo hydro project in Serbia

Canada-based Reservoir Capital have decided to abandon Brodarevo hydro project which included two hydropower plants (HPPs) Brodarevo 1 and Brodarevo 2 on Lim river in Southwest Serbia, with installed capacity of 59 MW. The decision comes after a decade-long development of the EUR 150 million project. Reservoir Capital announced that its wholly owned Serbian subsidiary, […]

Electricity January 25, 2018

Elektroprivreda BiH planning five major projects by 2020, including wind farm and hydro power plants

The power utility Elektroprivreda Bosne i Hercegovine (EPBiH) is planning to start the construction of five new facilities to produce electricity, including the Podveležje wind farm, small hydro power plants on the Neretvica river and the hydro power plants Janjići and Una Kostela-Aneks over the next three year. The total investments in that period will […]

EPS completes Đerdap 1 unit revitalization, ups capacity by 60 MW

The overhaul of four units of hydroelectric power plant Đerdap 1 has increased the plant’s installed capacity by 60 MW, which will result in its electricity generation increasing by 90 million kWh, or 2% of last year’s production. Having completed the revitalization of hydro generators A4, A5 and A6, state-owned power company Elektroprivreda Srbije (EPS) […]

Electricity October 18, 2017