Renewables

Albania to seek investors in solar power plants at unused military airports

Albania-investors-solar-power-plants-unused-military-airports

Photo: iStock

Published

September 7, 2023

Country

Comments

comments icon

0

Share

Published:

September 7, 2023

Country:

Comments:

comments icon

0

Share

Albanian Investment Corp. intends to develop solar power projects at abandoned military properties. It said it wants to establish partnerships with private companies to use the airport in Shkodër and the runway in Saranda.

A feasibility study is underway for a photovoltaic plant of 27 MW in peak capacity at the Fushor airport in Shkodër, or Shkodra, in north Albania, according to the Albanian Investment Corp. (AIC). The runway in Saranda in the country’s far south, also an abandoned military property, can fit 7 MW, the government agency revealed and Monitor reported.

The two locations were picked after last year’s preliminary analysis of 11 sites owned by the Ministry of Defence. The chosen ones have the highest energy potential and a clear ownership status, AIC added. It was established four years ago.

Albanian Investment Corp. hasn’t facilitated any investments since it was established four years ago

The site in Shkodër spans 31.8 hectares and the one in Saranda has 8.6 hectares. After the study, the institution will need approval from the ministry. Then it intends to seek partnerships with experienced private companies, the article reads.

AIC hasn’t facilitated any investments yet, so the government is drafting changes to the relevant law, the news outlet wrote.

Elsewhere in the region tracked by Balkan Green Energy News, Slovenia is also planning a public-private partnership for photovoltaic facilities at a military facility. The idea is to install solar power panels on the buildings in the Edvard Peperko barracks in the capital city of Ljubljana to boost the army’s energy self-sufficiency.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

nova bess romania battery

Romania’s biggest battery system put into operation

13 December 2025 - Nova Power & Gas has commissioned a battery energy storage system with an operating power of 200 MW and a capacity of 400 MWh

north macedonia power line dalekovod kodar elnos mepso croatia serbia bih

Firms from Croatia, BiH, Serbia to build power line in North Macedonia

12 December 2025 - The contracted works include the construction of a 400 kV power line from the 400/110 kV Bitola 2 substation to the border with Albania 

slovenia climate vulnerability risks energy assessment

Slovenia draws up first climate vulnerability, risks assessment for energy sector

12 December 2025 - The assessment was prepared by the Ministry of the Environment, Climate and Energy, in cooperation with the Jožef Stefan Institute

Turkey awards 1 15 GW wind power auctions all at EUR 35 per MWh

Turkey awards 1.15 GW in wind power auctions – all at just EUR 35 per MWh

12 December 2025 - The six winners from the latest round of wind power auctions under the YEKA mechanism in Turkey have EUR 35 per MWh guaranteed