Renewables

Albania to seek investors in solar power plants at unused military airports

Albania-investors-solar-power-plants-unused-military-airports

Photo: iStock

Published

September 7, 2023

Country

Comments

comments icon

0

Share

Published:

September 7, 2023

Country:

Comments:

comments icon

0

Share

Albanian Investment Corp. intends to develop solar power projects at abandoned military properties. It said it wants to establish partnerships with private companies to use the airport in Shkodër and the runway in Saranda.

A feasibility study is underway for a photovoltaic plant of 27 MW in peak capacity at the Fushor airport in Shkodër, or Shkodra, in north Albania, according to the Albanian Investment Corp. (AIC). The runway in Saranda in the country’s far south, also an abandoned military property, can fit 7 MW, the government agency revealed and Monitor reported.

The two locations were picked after last year’s preliminary analysis of 11 sites owned by the Ministry of Defence. The chosen ones have the highest energy potential and a clear ownership status, AIC added. It was established four years ago.

Albanian Investment Corp. hasn’t facilitated any investments since it was established four years ago

The site in Shkodër spans 31.8 hectares and the one in Saranda has 8.6 hectares. After the study, the institution will need approval from the ministry. Then it intends to seek partnerships with experienced private companies, the article reads.

AIC hasn’t facilitated any investments yet, so the government is drafting changes to the relevant law, the news outlet wrote.

Elsewhere in the region tracked by Balkan Green Energy News, Slovenia is also planning a public-private partnership for photovoltaic facilities at a military facility. The idea is to install solar power panels on the buildings in the Edvard Peperko barracks in the capital city of Ljubljana to boost the army’s energy self-sufficiency.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

Romania calls agricultural food firms apply solar wind power grants

Romania calls agricultural, food firms to apply for solar, wind power grants

25 December 2024 - The Agency for Financing Rural Investments (AFIR) has EUR 150 million in grants for photovoltaic and wind power in Romania

republic of srpska gacko ugljevik coal power

Republic of Srpska doesn’t have EUR 357 million to maintain production in coal power plants

24 December 2024 - Minister Petar Đokić held a meeting with the boards of directors and supervisory boards of coal complexes Gacko and Ugljevik

IPTO completes Attica Crete subsea interconnection Ariadne

IPTO completes Attica-Crete subsea interconnection Ariadne

24 December 2024 - Greece's IPTO started partial tests of the Ariadne interconnector between the mainland grid and Crete. The link has 1 GW in capacity.

Romanian Minister of Energy Sebastian Burduja reappointed

Romanian Minister of Energy Sebastian Burduja reappointed

24 December 2024 - Minister of Energy Sebastian Burduja remained in his seat following the recent general elections in Romania. He promised continuity and an acceleration in investment.