Renewables

Albania to seek investors in solar power plants at unused military airports

Albania-investors-solar-power-plants-unused-military-airports

Photo: iStock

Published

September 7, 2023

Country

Comments

comments icon

0

Share

Published:

September 7, 2023

Country:

Comments:

comments icon

0

Share

Albanian Investment Corp. intends to develop solar power projects at abandoned military properties. It said it wants to establish partnerships with private companies to use the airport in Shkodër and the runway in Saranda.

A feasibility study is underway for a photovoltaic plant of 27 MW in peak capacity at the Fushor airport in Shkodër, or Shkodra, in north Albania, according to the Albanian Investment Corp. (AIC). The runway in Saranda in the country’s far south, also an abandoned military property, can fit 7 MW, the government agency revealed and Monitor reported.

The two locations were picked after last year’s preliminary analysis of 11 sites owned by the Ministry of Defence. The chosen ones have the highest energy potential and a clear ownership status, AIC added. It was established four years ago.

Albanian Investment Corp. hasn’t facilitated any investments since it was established four years ago

The site in Shkodër spans 31.8 hectares and the one in Saranda has 8.6 hectares. After the study, the institution will need approval from the ministry. Then it intends to seek partnerships with experienced private companies, the article reads.

AIC hasn’t facilitated any investments yet, so the government is drafting changes to the relevant law, the news outlet wrote.

Elsewhere in the region tracked by Balkan Green Energy News, Slovenia is also planning a public-private partnership for photovoltaic facilities at a military facility. The idea is to install solar power panels on the buildings in the Edvard Peperko barracks in the capital city of Ljubljana to boost the army’s energy self-sufficiency.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

serbia eu region bef 2026 grid flexibility panel

Renewable energy ambitions must include ways to ensure grid integration

22 May 2026 - Market participants in the region have differing views of the current state of the grid, according to a panel held at Belgrade Energy Forum 2026

Greece PPC Group raises EUR 4.5 billion in capital offering

Greece’s PPC Group raises EUR 4.5 billion in capital offering

22 May 2026 - Public Power Corp. conducted a historic share capital increase of EUR 4.5 billion. The government and existing stockholder CVC covered 55.6%.

DRI operating licence for Văcărești solar park in Romania

DRI gets operating licence for Văcărești solar park in Romania

22 May 2026 - DRI has received the commercial operating license for its 126 MW Văcărești solar park in Dâmbovița county near Bucharest

SANY Renewable Energy Alibunar wind parks Serbia end June 2026

SANY Renewable Energy to start building Alibunar wind parks in Serbia by end-June

22 May 2026 - SANY Renewable Energy has signed agreements with contractors for its wind power projects Alibunar 1 and 2 in northeastern Serbia