Renewables

Slovenia, Albania to install solar power plants at army properties

Slovenia Albania solar power plants army properties

Photo: Sreejithk2000 / https://creativecommons.org/licenses/by-sa/4.0/legalcode

Published

April 3, 2023

Country

,

Comments

0

Share

Published:

April 3, 2023

Country:

,

Comments:

0

Share

Albania is preparing a public call for solar power projects at two former military airports while Slovenia intends to establish a public-private partnership at an army barracks in Ljubljana.

The Albanian Investment Corp. (AIC) aims to build two photovoltaic parks of an overall 34 MW in peak capacity on two unused lots owned by the Ministry of Defence, Scan reports. According to a preliminary analysis from a year ago, the areas have high solar radiation potential.

A tender is in the works for a consultant for a feasibility study for unused army airports in Shkodër and Saranda, with a budget of EUR 64,000. The locations span 31.8 and 8.6 hectares, respectively. The selected company will be tasked with providing the cost and profitability figures and financing options.

Slovenia will look for an investor within a public-private partnership to install photovoltaic systems on the roofs of buildings at an army barracks in Ljubljana

The Government of Slovenia issued a regulation for a planned public-private partnership for photovoltaic facilities at the Edvard Peperko military barracks in the capital city of Ljubljana.

The upcoming concession is aimed at achieving the army facility’s self-sufficiency and saving energy. In addition, the government is planning to use public funds to renovate the ten structures at the site to cut their primary energy consumption by half and reduce greenhouse gas emissions by 648 tons of carbon dioxide equivalent per year.

The solar power project is for the roofs of existing and new buildings. It is estimated at just over EUR 5 million. The photovoltaic facilities should provide 3.7 GWh per year or almost two times more than the electricity consumption at the barracks, according to the regulation. They are scheduled to be installed by 2024.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

CAN Europe Western Balkan contries in preparing NECP national energy climate plan

CAN Europe: Western Balkans took little to no action in preparing NECPs

05 June 2023 - In 2021, the obligation to adopt NECPs was postponed until 2024 at the latest while the deadline for delivering drafts is June 30, 2023

Serbia sets maximum premiums for wind solar auctions

Serbia sets maximum prices for wind, solar power auctions

05 June 2023 - The setting of the price is one of the most important steps in the preparation for the first auctions in the country

Energy transition development opportunity EPCG Montenegro

Energy transition is development opportunity for EPCG, entire Montenegro

03 June 2023 - The energy transition proved to be a development opportunity for Montenegro, headline speakers said at the EPCG Net event in Budva

serbia law on energy changes

Serbia is changing energy law: state commission for energy networks to be established

02 June 2023 - The Government of Serbia approved a bill with changes to the Law on Energy, largely to transpose the European Union's acquis