Renewables

Greece to require over twice as much storage as solar by 2030

Greece will need twice as much storage as solar by 2030

Photo: Prostooleh on freepik.com

Published

April 9, 2026

Country

Comments

comments icon

1

Share

Published:

April 9, 2026

Country:

Comments:

comments icon

1

Share

A new study shows the appropriate energy storage capacity in Greece for 2030 is 37.5 GWh.

The Aristotle University of Thessaloniki, together with Grant Thornton, conducted a study on behalf of the Independent Transmission Operator (IPTO or ADMIE). Professor Pantelis Biskas said this week during the Power & Gas Forum in Athens that one of the most important goals was to determine the optimal storage capacity, while keeping in mind system costs.

The first battery storage facilities are making their entrance into the Greek energy market. The country’s goal is to install upwards of 4.3 GW by the end of this decade, although the sector expects something closer to 4 GW. At the same time, 15 GW to 16 GW of photovoltaics is expected to operate.

Natural gas to become commercially unsustainable

Biskas revealed that the best scenario for storage is 37.5 GWh. This keeps the cost of developing storage to acceptable levels, while providing coverage for many hours each day. On the contrary, if Greece wanted to cover 97% of its needs exclusively through the combination of solar and storage, it would raise the levelized cost of energy (LCOE) to levels equal to natural gas units.

It was also mentioned that, as a result of the mass introduction of storage, natural gas plants would become commercially unsustainable. Therefore, the introduction of a capacity mechanism to support their availability is among possible solutions.

New tools to improve financing

As things stand right now, storage investments are vastly profitable, since the daily arbitrage between the lowest and highest wholesale power price stands at about EUR 200 per MWh. However, their gradual growth is expected to reduce margins and it is uncertain whether later projects will be sustainable.

Aurora Energy Research said that risk management will be essential from now on. Tools such as tolling agreements, day-ahead spread swaps and hybrid power purchase agreements (PPAs) can improve project financing.

Comments (1)
Miloš / April 12, 2026

Framing this as “over twice as much” is plainly incorrect, as one thing is in GWh and the other in GW. Its as if i said that a car that is 5 meters long and going 25m/s is 5 times faster than it is long.
The actual headline should be, “over two hours of peak production of storage capacity” or something like that

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

serbia eu region bef 2026 grid flexibility panel

Renewable energy ambitions must include ways to ensure grid integration

22 May 2026 - Market participants in the region have differing views of the current state of the grid, according to a panel held at Belgrade Energy Forum 2026

Greece PPC Group raises EUR 4.5 billion in capital offering

Greece’s PPC Group raises EUR 4.5 billion in capital offering

22 May 2026 - Public Power Corp. conducted a historic share capital increase of EUR 4.5 billion. The government and existing stockholder CVC covered 55.6%.

DRI operating licence for Văcărești solar park in Romania

DRI gets operating licence for Văcărești solar park in Romania

22 May 2026 - DRI has received the commercial operating license for its 126 MW Văcărești solar park in Dâmbovița county near Bucharest

SANY Renewable Energy Alibunar wind parks Serbia end June 2026

SANY Renewable Energy to start building Alibunar wind parks in Serbia by end-June

22 May 2026 - SANY Renewable Energy has signed agreements with contractors for its wind power projects Alibunar 1 and 2 in northeastern Serbia