Balkan Green Energy News
EN SR
Subscribe
  • Renewables
    • Biomass & Biogas
    • Geothermal
    • Solar
    • Solar thermal
    • Wind
    • Hydropower
  • Electricity
  • Energy Efficiency
  • Grids
  • Environment and Climate
    • Biodiversity
    • Climate Change
    • Pollution
    • Waste
    • Water
  • Energy Storage
  • Hydrogen
  • Nuclear
  • Fossil fuels
    • Coal
    • Gas
    • Oil
  • Digitalisation and AI
  • Features
  • Interviews
Trending:

PPC signs deal with Amazon to develop 300 MW data center

Three official bids submitted for first wind auction in Kosovo*

Serbia, Masdar weigh large-scale BESS projects

Colić: Renewable energy projects in Serbia jeopardized

EU Parliament backs expanding CBAM to steel, aluminium end goods

New credit line for digitalization, green, and sustainable projects in Serbia

Slovenia scraps electric vehicle subsidies 

Von der Leyen: EU to roll out heatwave, water, climate resilience packages

Powering grid resilience: Enexus selects LONGi’s BESS solutions for key utility projects in Romania

MOL Group expands its renewables portfolio with solar park, BESS

Slovenia’s largest solar power plant enters trial operation

Greensmalt to build Romania’s second solar panel recycling plant in Seini

Simtel Team gets battery contract in Romania for OMV Petrom’s first large solar park

Croatian cooking oil factory to source 60% of power needs from solar plants

Renovatio, Greenvolt to build battery system of over 900 MWh in Romania

Montenegrin energy utilities plan joint data center

Albania proposes rules for renewable energy communities

Bulgaria renovates 570 buildings, achieving at least 30% energy savings per site

EU proposes energy, water rating scheme for data centres

PPC signs deal with Amazon to develop 300 MW data center

Three official bids submitted for first wind auction in Kosovo*

Serbia, Masdar weigh large-scale BESS projects

Colić: Renewable energy projects in Serbia jeopardized

EU Parliament backs expanding CBAM to steel, aluminium end goods

New credit line for digitalization, green, and sustainable projects in Serbia

Slovenia scraps electric vehicle subsidies 

Von der Leyen: EU to roll out heatwave, water, climate resilience packages

Powering grid resilience: Enexus selects LONGi’s BESS solutions for key utility projects in Romania

MOL Group expands its renewables portfolio with solar park, BESS

Slovenia’s largest solar power plant enters trial operation

Greensmalt to build Romania’s second solar panel recycling plant in Seini

Simtel Team gets battery contract in Romania for OMV Petrom’s first large solar park

Croatian cooking oil factory to source 60% of power needs from solar plants

Renovatio, Greenvolt to build battery system of over 900 MWh in Romania

Montenegrin energy utilities plan joint data center

Albania proposes rules for renewable energy communities

Bulgaria renovates 570 buildings, achieving at least 30% energy savings per site

EU proposes energy, water rating scheme for data centres

Balkan Green Energy News
EN SR
  • Home
  • Renewables
    • Biomass & Biogas
    • Geothermal
    • Solar
    • Solar thermal
    • Wind
    • Hydropower
  • Electricity
  • Energy Efficiency
  • Grids
  • Environment and Climate
    • Biodiversity
    • Climate Change
    • Pollution
    • Waste
    • Water
  • Energy Storage
  • Hydrogen
  • Nuclear
  • Fossil fuels
    • Coal
    • Gas
    • Oil
  • Digitalisation and AI
  • Features
  • Interviews
  • Events
  • GIZ
  • Jobs
Follow Us
Trending:

PPC signs deal with Amazon to develop 300 MW data center

Three official bids submitted for first wind auction in Kosovo*

Serbia, Masdar weigh large-scale BESS projects

Colić: Renewable energy projects in Serbia jeopardized

EU Parliament backs expanding CBAM to steel, aluminium end goods

New credit line for digitalization, green, and sustainable projects in Serbia

Slovenia scraps electric vehicle subsidies 

Von der Leyen: EU to roll out heatwave, water, climate resilience packages

Powering grid resilience: Enexus selects LONGi’s BESS solutions for key utility projects in Romania

MOL Group expands its renewables portfolio with solar park, BESS

Slovenia’s largest solar power plant enters trial operation

Greensmalt to build Romania’s second solar panel recycling plant in Seini

Simtel Team gets battery contract in Romania for OMV Petrom’s first large solar park

Croatian cooking oil factory to source 60% of power needs from solar plants

Renovatio, Greenvolt to build battery system of over 900 MWh in Romania

Montenegrin energy utilities plan joint data center

Albania proposes rules for renewable energy communities

Bulgaria renovates 570 buildings, achieving at least 30% energy savings per site

EU proposes energy, water rating scheme for data centres

PPC signs deal with Amazon to develop 300 MW data center

Three official bids submitted for first wind auction in Kosovo*

Serbia, Masdar weigh large-scale BESS projects

Colić: Renewable energy projects in Serbia jeopardized

EU Parliament backs expanding CBAM to steel, aluminium end goods

New credit line for digitalization, green, and sustainable projects in Serbia

Slovenia scraps electric vehicle subsidies 

Von der Leyen: EU to roll out heatwave, water, climate resilience packages

Powering grid resilience: Enexus selects LONGi’s BESS solutions for key utility projects in Romania

MOL Group expands its renewables portfolio with solar park, BESS

Slovenia’s largest solar power plant enters trial operation

Greensmalt to build Romania’s second solar panel recycling plant in Seini

Simtel Team gets battery contract in Romania for OMV Petrom’s first large solar park

Croatian cooking oil factory to source 60% of power needs from solar plants

Renovatio, Greenvolt to build battery system of over 900 MWh in Romania

Montenegrin energy utilities plan joint data center

Albania proposes rules for renewable energy communities

Bulgaria renovates 570 buildings, achieving at least 30% energy savings per site

EU proposes energy, water rating scheme for data centres

investments

serbia erste eib loans sme digitalization ai green transistion terzic amor richard

New credit line for digitalization, green, and sustainable projects in Serbia

Companies in Serbia now have access to a EUR 20 million credit line for digitalization, the green transition, and sustainable agriculture

Digitalisation and AI
Serbia
September 21, 2026
hungary mol Algyő solar park battery

MOL Group expands its renewables portfolio with solar park, BESS

MOL Group has inaugurated a new 37.4 MWp solar park and an associated electricity storage system with 20 MW of nominal capacity

Renewables
Region/EU
September 18, 2026
serbia masdar memorandum eps BESS dubravka djedovic handanovic Mohamed Jameel Al Ramahi

Serbia, Masdar weigh large-scale BESS projects

Serbia plans to continue its partnership with Masdar in the renewable energy sector

Energy Storage
Serbia
September 15, 2026
romania Greensmalt recycling solar panels

Greensmalt to build Romania’s second solar panel recycling plant in Seini

Romanian company Greensmalt intends to establish a photovoltaic panel recycling facility in the town of Seini in Maramureș county

Environment and Climate
Romania
September 15, 2026
slovenia-ngen-Wagenham-bess-austria

NGEN commissions largest battery storage system in Austria

NGEN has commissioned the Wagenham battery energy storage system in Upper Austria

Energy Storage
Region/EU Slovenia
September 15, 2026
bih epbih girisim contract solar gracanica

Girişim Elektrik to install two solar plants for state power utility of BiH

Turkish EPC contractor Girişim Elektrik and Bosnia and Herzegovina’s state-owned power utility Elektroprivreda BiH have signed a contract for two solar plants

Solar
Bosnia and Herzegovina
September 11, 2026
romania hidroelectrica bess iron gates II Synergy Construct

Hidroelectrica picks contractor for BESS at Iron Gates II hydropower plant

Romanian hydropower company Hidroelectrica has made a big step towards installing its second battery energy storage system

Energy Storage
Romania
September 11, 2026
wind farm stip financing alcazar

Alcazar secures EUR 180 million for first phase of 396 MW wind farm in North Macedonia

Alcazar Energy Partners has secured a EUR 180 million loan for the first phase of the Štip wind farm in North Macedonia, which is expected to be the largest in the Western Balkans

Wind
North Macedonia
September 10, 2026
  • 1
  • 2
  • 3
  • ...
  • 67
Stay ahead in energy

Get weekly updates from Southeast Europe

Subscribe
Balkan Green Energy News
Follow Us
Stay ahead in energy

Get weekly updates from Southeast Europe.

Subscribe
Category
  • Home
  • Renewables
  • Electricity
  • Energy Efficiency
  • Grids
  • Environment and Climate
  • Energy Storage
  • Hydrogen
  • Nuclear
  • Fossil fuels
  • Digitalisation and AI
  • Features
  • Interviews
Company
  • Subscribe
  • Contact
  • Advertising
  • About Us
  • Disclaimer
Follow Us
  • Privacy Policy
  • Cookies

© 2026 Balkan Green Energy News All rights reserved. Developed by Cubes