Balkan Green Energy News
EN SR
Subscribe
  • Renewables
    • Biomass & Biogas
    • Geothermal
    • Solar
    • Solar thermal
    • Wind
    • Hydropower
  • Electricity
  • Energy Efficiency
  • Grids
  • Environment and Climate
    • Biodiversity
    • Climate Change
    • Pollution
    • Waste
    • Water
  • Energy Storage
  • Hydrogen
  • Nuclear
  • Fossil fuels
    • Coal
    • Gas
    • Oil
  • Digitalisation and AI
  • Features
  • Interviews
Trending:

Mervar: Krško 2 electricity to cost EUR 133 per MWh

New COP31 initiatives call for green AI development

EU recognizes Albanian, Montenegrin, Serbian carbon pricing within CBAM

US expands its European energy ties at P-TEC conference in Warsaw

Montenegro, US to strengthen cooperation in energy infrastructure, investments

Evaluating Serbia’s feed-in tariffs: EUR 1.5 billion paid out over 12 years

Wpd to add battery energy storage to its second wind farm in Croatia

Energy Traders Europe elects Board leadership, members

Kosovo* introduces emergency measures for electricity supply

Croatia’s JANAF repairs pipeline, resumes oil supply to NIS refinery in Serbia

North Macedonia introduces negative power prices

Algeria eyes Energoinvest for participation in African projects

HEP launches EUR 480 million tender for Kosinj hydropower system

Eurelectric: Negative power prices are signal for flexibility, not failure

Greece accelerates efforts to interconnect Dodecanese, North Aegean islands

Bulgaria plans 5% tax on standalone battery revenues, raising investor concerns

Montenegro rolls out fuel marking system

COP31 ends without joint statement amid failed talks on decarbonization

Mervar: Krško 2 electricity to cost EUR 133 per MWh

New COP31 initiatives call for green AI development

EU recognizes Albanian, Montenegrin, Serbian carbon pricing within CBAM

US expands its European energy ties at P-TEC conference in Warsaw

Montenegro, US to strengthen cooperation in energy infrastructure, investments

Evaluating Serbia’s feed-in tariffs: EUR 1.5 billion paid out over 12 years

Wpd to add battery energy storage to its second wind farm in Croatia

Energy Traders Europe elects Board leadership, members

Kosovo* introduces emergency measures for electricity supply

Croatia’s JANAF repairs pipeline, resumes oil supply to NIS refinery in Serbia

North Macedonia introduces negative power prices

Algeria eyes Energoinvest for participation in African projects

HEP launches EUR 480 million tender for Kosinj hydropower system

Eurelectric: Negative power prices are signal for flexibility, not failure

Greece accelerates efforts to interconnect Dodecanese, North Aegean islands

Bulgaria plans 5% tax on standalone battery revenues, raising investor concerns

Montenegro rolls out fuel marking system

COP31 ends without joint statement amid failed talks on decarbonization

Balkan Green Energy News
EN SR
  • Home
  • Renewables
    • Biomass & Biogas
    • Geothermal
    • Solar
    • Solar thermal
    • Wind
    • Hydropower
  • Electricity
  • Energy Efficiency
  • Grids
  • Environment and Climate
    • Biodiversity
    • Climate Change
    • Pollution
    • Waste
    • Water
  • Energy Storage
  • Hydrogen
  • Nuclear
  • Fossil fuels
    • Coal
    • Gas
    • Oil
  • Digitalisation and AI
  • Features
  • Interviews
  • Events
  • GIZ
  • Jobs
Follow Us
Trending:

Mervar: Krško 2 electricity to cost EUR 133 per MWh

New COP31 initiatives call for green AI development

EU recognizes Albanian, Montenegrin, Serbian carbon pricing within CBAM

US expands its European energy ties at P-TEC conference in Warsaw

Montenegro, US to strengthen cooperation in energy infrastructure, investments

Evaluating Serbia’s feed-in tariffs: EUR 1.5 billion paid out over 12 years

Wpd to add battery energy storage to its second wind farm in Croatia

Energy Traders Europe elects Board leadership, members

Kosovo* introduces emergency measures for electricity supply

Croatia’s JANAF repairs pipeline, resumes oil supply to NIS refinery in Serbia

North Macedonia introduces negative power prices

Algeria eyes Energoinvest for participation in African projects

HEP launches EUR 480 million tender for Kosinj hydropower system

Eurelectric: Negative power prices are signal for flexibility, not failure

Greece accelerates efforts to interconnect Dodecanese, North Aegean islands

Bulgaria plans 5% tax on standalone battery revenues, raising investor concerns

Montenegro rolls out fuel marking system

COP31 ends without joint statement amid failed talks on decarbonization

Mervar: Krško 2 electricity to cost EUR 133 per MWh

New COP31 initiatives call for green AI development

EU recognizes Albanian, Montenegrin, Serbian carbon pricing within CBAM

US expands its European energy ties at P-TEC conference in Warsaw

Montenegro, US to strengthen cooperation in energy infrastructure, investments

Evaluating Serbia’s feed-in tariffs: EUR 1.5 billion paid out over 12 years

Wpd to add battery energy storage to its second wind farm in Croatia

Energy Traders Europe elects Board leadership, members

Kosovo* introduces emergency measures for electricity supply

Croatia’s JANAF repairs pipeline, resumes oil supply to NIS refinery in Serbia

North Macedonia introduces negative power prices

Algeria eyes Energoinvest for participation in African projects

HEP launches EUR 480 million tender for Kosinj hydropower system

Eurelectric: Negative power prices are signal for flexibility, not failure

Greece accelerates efforts to interconnect Dodecanese, North Aegean islands

Bulgaria plans 5% tax on standalone battery revenues, raising investor concerns

Montenegro rolls out fuel marking system

COP31 ends without joint statement amid failed talks on decarbonization

Bosnia and Herzegovina

Republic of Srpska plans to build solar power plants on abandoned coal mines

Republic of Srpska plans to build solar power plants on abandoned coal mines

The Minister of Energy and Mining Petar Đokić has discussed the construction of solar power plants with the management of RiTE Ugljevik.

Renewables
Bosnia and Herzegovina
September 23, 2021
gopa-ers-wind-farm-hrgud-contract

Germany’s GOPA to advise ERS on Hrgud wind farm project

Germany’s GOPA will be ERS's adviser in preparing project documents and overseeing the construction of wind farm Hrgud.

Renewables
Bosnia and Herzegovina
September 22, 2021
Third utility-scale solar power plant to be installed in Herzegovina etmax

Fourth utility-scale solar power plant planned to be developed in Herzegovina

The Government of the Republic Srpska decided to initiate the procedure for granting a concession for the Nevesinje PV plant.

Renewables
Bosnia and Herzegovina
September 17, 2021
EPBIH ready to continue construction of Tuzla 7 coal project

EPBIH ready to continue construction of Tuzla 7 coal project

The coal-fired unit project has been stalled for almost a year after General Electric decided not to supply the equipment.

Electricity
Bosnia and Herzegovina
September 13, 2021
Whats-new-in-Republic-of-Srpskas-draft-law-on-renewables

What’s new in Republic of Srpska’s draft law on renewables?

The new law will be aligned to a great extent with the EU’s Directive on the promotion of the use of energy from renewable sources.

Renewables
Bosnia and Herzegovina
September 9, 2021
Bileća hydropower plant 32 MW BiH

Bileća hydropower plant project of 32 MW under development in BiH

State-owned firm HET intends to install hydropower plant Bileća of 32 MW as the third and last unit of a subsystem on the Trebišnjica river

Renewables
Bosnia and Herzegovina
September 9, 2021
BiH joint commission for concessions on Buk Bijela project to be established in September

Special panel in BiH to address dispute over Buk Bijela hydropower project

The Commission for Concessions of BiH will act upon the request of the Constitutional Court of BiH and establish a joint commission.

Electricity
Bosnia and Herzegovina
September 1, 2021
Locals activists coal plant Ugljevik 3 study clearly incomplete

Locals, activists say coal plant Ugljevik 3 study is clearly incomplete

Locals and environmentalists said the draft environmental study for Ugljevik 3 coal project is incomplete and that it doesn't reveal the real potential damage

Environment and Climate
Bosnia and Herzegovina
September 1, 2021
  • 1
  • ...
  • 42
  • 43
  • 44
  • 45
  • 46
  • ...
  • 109
Stay ahead in energy

Get weekly updates from Southeast Europe

Subscribe
Balkan Green Energy News
Follow Us
Stay ahead in energy

Get weekly updates from Southeast Europe.

Subscribe
Category
  • Home
  • Renewables
  • Electricity
  • Energy Efficiency
  • Grids
  • Environment and Climate
  • Energy Storage
  • Hydrogen
  • Nuclear
  • Fossil fuels
  • Digitalisation and AI
  • Features
  • Interviews
Company
  • Subscribe
  • Contact
  • Advertising
  • About Us
  • Disclaimer
Follow Us
  • Privacy Policy
  • Cookies

© 2026 Balkan Green Energy News All rights reserved. Developed by Cubes