Renewables

OMV Petrom plans bioethanol plant, biggest solar park in Romania

OMV Petrom bioethanol biggest solar park Romania

Photo: Ryan Searle on Unsplash

Published

November 12, 2020

Country

Comments

comments icon

0

Share

Published:

November 12, 2020

Country:

Comments:

comments icon

0

Share

OMV Petrom, the largest energy company in Romania, intends to build a bioethanol factory worth EUR 246 million and a solar power plant valued at EUR 82 million, local media reported.

Within the 10d mechanism, through which the government in Bucharest will distribute allocations from the European Union’s Modernization Fund, OMV Petrom applied for support for two major renewable energy projects, news outlets in Romania learned.

Second-generation bioethanol plant to be built in Prahova

Unnamed people familiar with the matter told E-nergia.ro that the largest oil producer and refiner in the country would develop a second-generation bioethanol plant project. The company is said to have requested 35% of the investment worth EUR 246 million, excluding value-added tax.

OMV Petrom has petrol stations in Romania, Moldova, Bulgaria and Serbia

The oil company intends to build the factory in Prahova County. The area in the central part of the country is also eligible for funding from the EU’s Fair Transition Fund. According to the law, the gasoline that is sold at gas stations in Romania must have an 8% share of bioethanol.

OMV Petrom operates filling stations in Romania under the OMV and Petrom brands. It is also present in Moldova, Bulgaria and Serbia. It has been installing chargers for electric cars and solar panels at its retail units.

OMV Petrom applies for half of expenses for 111 MW solar power plant

Economica.net separately reported, without identifying sources, that the company is working on a 111 MW solar power project in Ișalnița in Dolj County in the southwest. The insiders said it applied for 50% of the EUR 82 million endeavor.

It owns the location, where it produced fertilizers and methanol until a decade ago. If the planned photovoltaic unit came online, it would currently be by far the biggest of its kind in Romania. However, struggling state-controlled Complexul Energetic Oltenia intends to install eight solar parks with a total capacity of 700 MW in its coal complex as it decommissions open pits and sludge and ash landfills.

The oil producer and refiner reported a 70% plunge in net income for the first three quarters amid falling prices

Of note, three years ago OMV Petrom sold its 45 MW Dorobanțu wind farm in Dobruja to Transeastern Power.

The largest energy firm in Romania is 51% owned by Austria-based OMV, while the state holds 21%. OMV Petrom is listed on the Bucharest Stock Exchange and the London Stock Exchange.

It recently posted a year-on-year drop in profit by 70% to EUR 170 million for the first nine months of this year, citing the drop in prices of oil and fuel. Turnover slumped 17% from the same period in 2019, to EUR 3.1 billion.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

greece helleniq energy romania bulgaria wind solar profit

Bulgaria, Romania offer much higher renewable energy project returns than Greece – HELLENiQ Energy

12 August 2025 - Greece-based HELLENiQ Energy has purchased three projects at a ready-to-build phase in Romania and Bulgaria

New solar park in Romania 71 MW final permit launch

New solar park in Romania of 71 MW gets final permit for launch

12 August 2025 - Shikun and Binui Energy is about to begin delivering electricity to the Romanian grid from its Satu Mare photovoltaic plant

bulgaria batteries eso angelin tsachev

Bulgaria to add batteries of up to 10,000 MWh in capacity within months – ESO

12 August 2025 - Bulgaria’s Electricity System Operator has received grid connection applications for batteries with 12 GW in total capability

First part of Tenevo PV plant comes online batteries under construction

First part of Tenevo PV plant comes online, batteries are under construction

12 August 2025 - The largest hybrid power plant in Bulgaria is beginning to take shape as the Tenevo PV park came online and the BESS is under construction