Renewables

Fintel Energija to launch IPO on August 1

Photo: Fintel Energija

Published

July 25, 2018

Country

Comments

0

Share

Published:

July 25, 2018

Country:

Comments:

0

Share

Belgrade-based renewable energy company Fintel Energija, a subsidiary of Italy’s Fintel Energia, published the prospectus on July 25 for its initial public offering (IPO) on the Belgrade Stock Exchange (BELEX).

Fintel Energija, which has a total of 25 million issued shares, will now offer 6.5 million shares at RSD 500 (about EUR 4.24) as part of the IPO. The subscription will begin on August 1 and last until October 29, with Belgrade-based brokerage firm M&V Investments as an underwriter, the company said, local media reported.

The IPO will be considered successful if at least 1.5 million new shares are sold, according to the prospectus. Once the subscription process is complete, Fintel Energija will list all of its shares – the existing and newly issued ones – on the prime segment of the BELEX regulated market.

Fintel Energija has majority stakes in MK-Fintel Wind and MK-Fintel Wind Holding, its joint ventures with Serbian agribusiness-to-banking company MK Group, owned by businessman Miodrag Kostić.

The prospectus notes that Fintel Energija is Serbia’s leading independent renewable energy producer and the country’s second-largest renewable energy company, behind state power utility Elektroprivreda Srbije (EPS), the incumbent company on the market.

Wind farm portfolio

MK-Fintel Wind controls the 69 MW Košava phase 1 wind farm whose construction started in June last year. At the end of February, MK-Fintel Wind announced that it had secured EUR 81.5 million in lending for the completion of the Košava phase 1 wind farm, a project worth EUR 118 million, whose construction is expected to wrap up in late 2019.

MK-Fintel Wind Holding owns the other wind farms in Serbia built by Fintel Energia Group and MK Holding. The companies opened the 9.9 MW Kula wind farm, Serbia’s first, at the end of 2015, and the 6.6 MW La Piccolina wind farm in October 2016.

Fintel Energija’s pipeline includes seven more wind farms in various stages of development in Serbia.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

drina-hydropower-plants

Court annuls environmental permit for Drina hydropower project

02 May 2024 - The construction of large hydropower plants on the Drina is facing new delays, after a court ruling to scrap the environmental permit for HPP Foča

el-dorado-electricity-imports-north-macedonia-rke

North Macedonia: ‘Solar El Dorado’ cuts electricity imports to 2.75%

02 May 2024 - In 2023, North Macedonia's new solar capacity increased by as much as 251% compared to 2022

EU-completing-Green-Deal-Industrial-Plan-Net-Zero-Industry-Act

EU completing Green Deal Industrial Plan as Net Zero Industry Act awaits go-ahead

01 May 2024 - The European Union's Net Zero Industry Act is about to come into force, completing legislative work within the Green Deal Industrial Plan

Dubravka Dedovic Djedovic Handanovic reappointed Serbia minister of energy mining

Dubravka Đedović Handanović reappointed as Serbia’s minister of energy, mining

30 April 2024 - Minister of Energy and Mining Dubravka Đedović Handanović is keeping her seat in the new cabinet while Minister of Environmental Protection Irena Vujović is also becoming deputy prime minister