Renewables

Slovenia, Albania to install solar power plants at army properties

Slovenia Albania solar power plants army properties

Photo: Sreejithk2000 / https://creativecommons.org/licenses/by-sa/4.0/legalcode

Published

April 3, 2023

Country

,

Comments

comments icon

0

Share

Published:

April 3, 2023

Country:

,

Comments:

comments icon

0

Share

Albania is preparing a public call for solar power projects at two former military airports while Slovenia intends to establish a public-private partnership at an army barracks in Ljubljana.

The Albanian Investment Corp. (AIC) aims to build two photovoltaic parks of an overall 34 MW in peak capacity on two unused lots owned by the Ministry of Defence, Scan reports. According to a preliminary analysis from a year ago, the areas have high solar radiation potential.

A tender is in the works for a consultant for a feasibility study for unused army airports in Shkodër and Saranda, with a budget of EUR 64,000. The locations span 31.8 and 8.6 hectares, respectively. The selected company will be tasked with providing the cost and profitability figures and financing options.

Slovenia will look for an investor within a public-private partnership to install photovoltaic systems on the roofs of buildings at an army barracks in Ljubljana

The Government of Slovenia issued a regulation for a planned public-private partnership for photovoltaic facilities at the Edvard Peperko military barracks in the capital city of Ljubljana.

The upcoming concession is aimed at achieving the army facility’s self-sufficiency and saving energy. In addition, the government is planning to use public funds to renovate the ten structures at the site to cut their primary energy consumption by half and reduce greenhouse gas emissions by 648 tons of carbon dioxide equivalent per year.

The solar power project is for the roofs of existing and new buildings. It is estimated at just over EUR 5 million. The photovoltaic facilities should provide 3.7 GWh per year or almost two times more than the electricity consumption at the barracks, according to the regulation. They are scheduled to be installed by 2024.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

ems ai transmission

EMS plans to use AI in construction approvals

21 November 2024 - EMS has decided to automate its construction approval procedure by introducing state-of-the-art AI solutions

IPTO ENCS cybersecurity grid

Greece’s IPTO joins European Network for Cyber Security

21 November 2024 - The European Network for Cyber Security (ENCS) has announced that IPTO has officially joined the network as a full member

montenegro gvozd epcg nordex agreement

Montenegro’s power utility EPCG begins construction of Gvozd wind farm

21 November 2024 - Wind farm Gvozd will be the first large-scale power generation facility to be built by EPCG in more than 40 years

Bulgarian waterworks firm installs in pipe hydropower generator

Bulgarian waterworks firm installs in-pipe hydropower generator

21 November 2024 - A waterworks and sewerage firm in Bulgaria produces electricity using an in-pipe hydropower device in a supply line