Renewables

Slovenia, Albania to install solar power plants at army properties

Slovenia Albania solar power plants army properties

Photo: Sreejithk2000 / https://creativecommons.org/licenses/by-sa/4.0/legalcode

Published

April 3, 2023

Country

,

Comments

comments icon

0

Share

Published:

April 3, 2023

Country:

,

Comments:

comments icon

0

Share

Albania is preparing a public call for solar power projects at two former military airports while Slovenia intends to establish a public-private partnership at an army barracks in Ljubljana.

The Albanian Investment Corp. (AIC) aims to build two photovoltaic parks of an overall 34 MW in peak capacity on two unused lots owned by the Ministry of Defence, Scan reports. According to a preliminary analysis from a year ago, the areas have high solar radiation potential.

A tender is in the works for a consultant for a feasibility study for unused army airports in Shkodër and Saranda, with a budget of EUR 64,000. The locations span 31.8 and 8.6 hectares, respectively. The selected company will be tasked with providing the cost and profitability figures and financing options.

Slovenia will look for an investor within a public-private partnership to install photovoltaic systems on the roofs of buildings at an army barracks in Ljubljana

The Government of Slovenia issued a regulation for a planned public-private partnership for photovoltaic facilities at the Edvard Peperko military barracks in the capital city of Ljubljana.

The upcoming concession is aimed at achieving the army facility’s self-sufficiency and saving energy. In addition, the government is planning to use public funds to renovate the ten structures at the site to cut their primary energy consumption by half and reduce greenhouse gas emissions by 648 tons of carbon dioxide equivalent per year.

The solar power project is for the roofs of existing and new buildings. It is estimated at just over EUR 5 million. The photovoltaic facilities should provide 3.7 GWh per year or almost two times more than the electricity consumption at the barracks, according to the regulation. They are scheduled to be installed by 2024.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

Renewables investors are seeking tailored financing services as they add BESS adapt risks UniCredit Bank Serbia

Renewables investors are seeking tailored financing services as they add BESS, adapt to risks

26 November 2025 - The renewables market in CEE is challenging, alongside regulatory uncertainties, which calls for advanced financing solutions, according to participants in UniCredit Serbia’s workshop

romania premier energy bess Iasi battery

Premier Energy acquires 400 MWh battery energy storage project

26 November 2025 - Premier Energy Group has announced the acquisition of 100% of a ready-to-build project for a battery energy storage system.

slovenia cyber security eles ENCS member

Slovenia’s TSO ELES joins European Network for Cyber Security

26 November 2025 - ELES got access to the European Network for Cyber Security’s collaborative threat intelligence, specialist training and technical expertise

LONGi enters energy storage market redefining industry standards with Ultimate Safety

LONGi enters energy storage market, redefining industry standards with Ultimate Safety

26 November 2025 - LONGi announced its entry into the storage sector with the launch of the LONGi Energy Storage One-Stop Solution