Renewables

MingYang from China developing world’s largest offshore wind turbine

MingYang-China-world-largest-offshore-wind-turbine

MingYang Smart Energy

Published

August 24, 2021

Country

Comments

comments icon

2 Comments

Share

Published:

August 24, 2021

Country:

Comments:

comments icon

2 Comments

Share

MingYang Smart Energy scheduled the market launch of its 16 MW offshore wind turbine for 2024. The Chinese company said the largest wind turbine under development in the world will be able to supply enough electricity for 20,000 households.

The rapid rise in demand for electricity for renewable sources and the decrease in costs for wind power technology prompted MingYang Smart Energy to design the world’s strongest and biggest wind turbine. The company headquartered in Zhongshan in China’s Guangdong province unveiled the plan to start the commercial production of the 16 MW system in 2024.

The model is called MySE 16.0-242. The designers implemented the hybrid drive transmission concept and opted for a compact solution, the company said. Offshore turbines are generally much larger than those in onshore wind power plants.

MingYang China world s largest offshore wind turbine
MingYang Smart Energy

The 262-meter high wind turbine will be made to withstand typhoons, MingYang claims. It is envisaged to have a rotor with a 242-meter diameter, blades of 118 meters and a 4.6-hectare swept area.

A single MySE 16.0-242 will be able to generate 80 GWh of electricity per year, enough to power more than 20,000 households. In comparison, it produces 45% more energy than MingYang’s previous turbine model, the MySE 11.0-203.

The 262-meter high wind turbine is designed to withstand typhoons

Compared to coal-fired power generation, one MySE 16.0-242 can eliminate more than 1.6 million tonnes of CO2 emissions over the course of its designed 25-year lifespan, according to the announcement. It is the start of MingYang’s offshore portfolio of 15 MW or above.

The turbine manufacturer added it focuses its activities on Europe, the Americas and Asia-Pacific. The prototype is scheduled to be rolled out in 2022 and installed in the first half of the following year.

Offshore wind costs are on the way to drop almost 49% by 2050, or even 64% in the best case scenario

A recent study showed offshore wind costs are on the way to drop almost 49% by 2050, or even 64% in the best case scenario. Last year China installed more than half of the turbines in the segment on a global scale.

GE Renewable Energy has a 248-meter prototype of its Haliade-X model. It is designed for 12 MW to 14 MW and the height should reach 260 meters. Vestas is working on a 15 MW wind turbine, which Siemens Gamesa intends to match.

Comments (2)
All RASHEED Trade / November 28, 2022

We are interested in purchasing wind turbines which are 200KW size in large quantity

All RASHEED Trade / November 28, 2022

welcome my dear
We are interested in purchasing wind turbines which are 200KW size in large quantity
Thanks
Majid
Tell 00967-470877/473166
Mobile 00967770666068

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

croatia star energy enna geo geothermal projects

British Star Energy sells three geothermal projects in Croatia

30 April 2026 - The transaction releases EUR 5.2 million of restricted cash and removes future capital commitments arising from licences, the company said

Energy transition as systemic transformation Siemens Energy Lazar Mijic interview

Energy transition as systemic transformation

30 April 2026 - We spoke with Lazar Mijić, Head of Global Business Strategy in the business area Transformation of Industries at Siemens Energy, about where the region currently stands on the map of global energy transition

Greek government sees PV losses from zero prices as informal support for consumers

Greece frames solar power’s zero prices as informal consumer support

30 April 2026 - The Greek government is reluctant to remunerate photovoltaic producers for their high losses from zero or negative hourly wholesale prices

croatia grid connection fee hera decision

Croatia finally sets grid connection fee

29 April 2026 - The Croatian Energy Regulatory Agency (HERA) has adopted the fee for the connection to the electricity network