Renewables

EBRD may lend EUR 9.75 million to KESH for floating solar power plant

EBRD lend EUR 9.75 million KESH floating solar power plant

Photo: Invest in Albania

Published

August 4, 2020

Country

Comments

comments icon

0

Share

Published:

August 4, 2020

Country:

Comments:

comments icon

0

Share

Albania’s state-owned power producer may cover most of the cost for its hybrid power plant project with debt. EBRD targets October 21 for the approval of a secured loan of EUR 9.75 million for a floating photovoltaic system on the reservoir of the Vau i Dejës hydropower plant owned by KESH.

The European Bank for Reconstruction and Development revealed it is considering the possibility to back a hybrid power plant in Albania. State-owned power producer KESH has a 12.9 MW project for a floating solar power plant, which it plans to install on the reservoir of the Vau i Dejës hydropower facility and EBRD said it may cover EUR 9.75 million with a secured loan for the special purpose vehicle responsible for the endeavor.

The electricity produced by the new system, worth EUR 13.94 million, will be sold at market terms. According to the project summary document, the loan approval date is October 21.

Additions to Drin river hydropower cascade

KESH owns the 260 MW hydroelectric power station near Shkodra, part of its river Drin (Drim) cascade. The Vau i Dejës is the last one in the series. Of note, Albania has said it intends to start building the Skavica 210 MW hydropower plant upstream from the three existing ones.

The state-owned utility’s floating solar plant in Vau i Dejës would promote the technology to increase the region’s solar capacity through the efficient use of existing hydro reservoirs, EBRD said. At the same time, Statkraft is installing the first floating photovoltaic plant in Albania with Ocean Sun, also from Norway. Located near Elbasan, it is planned for the capacity of 2 MW.

Climate mitigation benefits

KESH’s 12.9 MW project will strengthen its operational and financial performance, EBRD stressed. “The transition impact arises from delivering climate mitigation benefits… The project will be built with minimal land utilisation and help reduce evaporation from water surfaces resulting in overall efficient use of resources,” the document reads.

The photovoltaic system on the artificial lake will span 11.8 hectares. Planners said it would prevent algae growth and improve water quality.

The decision on the loan will depend on the assessment of habitat or priority biodiversity features

Environmental and social due diligence (ESDD) is underway, according to the bank, to collect biodiversity and social baseline data and assess any critical habitat or priority biodiversity features as appropriate before the decision on the loan.

Albania has been making efforts to diversify its energy mix, which is dominated by hydropower. The country is vulnerable to changes in hydrological environment, so droughts can make it import electricity.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

Schletter Group expanding SEE region strengthened takeover from Enstall

Schletter Group expanding in SEE region, strengthened by takeover from Enstall

14 August 2024 - Enstall is acquiring Germany-based solar mounting systems provider Schletter Group, which is spreading its operations in South East Europe

Female Leader in Sustainable Energy

2024 Female Leader in Sustainable Energy award competition announced – apply by September 10

14 August 2024 - Under the auspices of Germany’s international cooperation agency GIZ, the WISE Serbia women's network is launching the 2024 Female Leader in Sustainable Energy contest

Bulgarian gas firms to make green hydrogen mix it into gas grid

Bulgarian gas firms to make green hydrogen, mix it into gas grid

13 August 2024 - The Bulgarian Natural Gas Association (BAPG) is planning a project to produce green hydrogen and mix it into the gas distribution grid

All set for construction of Široka draga wind park of 125.4 MW in BiH

All set for construction of Široka draga wind park of 125.4 MW in BiH

13 August 2024 - Local firm Imres Smart Greenergy signed the deal with the selected contractor on its Široka draga wind power project