Environment

Norway sets aside EUR 2.1 billion to develop carbon capture, storage

Norway EUR 2.1 billion carbon capture storage

Photo: Unsplash

Published

July 22, 2020

Country

Comments

comments icon

0

Share

Published:

July 22, 2020

Country:

Comments:

comments icon

0

Share

Equinor is working with Shell and Total on transferring liquefied CO2 through a pipeline to below the seabed so that it isn’t released into the atmosphere. Norway approved EUR 2.1 billion in state aid for the carbon capture and storage (CCS) project for a cement factory and a waste incinerator.

Regulators have agreed with the decision by the Council of State in Norway to support a carbon capture and storage – CCS project with EUR 2.1 billion. The panel within the European Free Trade Association (EFTA) said the state aid covering four fifths of the expenses doesn’t break rules.

Equinor, formerly known as Statoil, partnered with Total and Royal Dutch Shell on the development of a terminal in Øygarden in the country’s west and a pipeline to take liquefied carbon dioxide from a cement plant in Brevik and a waste-to-energy facility in Oslo offshore and bury it under the seabed. Fertilizer producer Yara has backed out of the initiative.

The first phase of the Northern Lights project, with the capacity of 1.5 million metric tons per year, is planned to become operational in 2024. The total budget, EUR 2.57 billion, is envisaged for the first ten years.

Race against green hydrogen

Fossil fuel companies are examining cost-effective ways to offset the burden of carbon certificates. At the same time, the European Union, which makes up the European Economic Area together with EFTA, is backing innovations like green hydrogen. It is introducing financial expenses for coal, oil and gas industries and opening the way for more renewables in the system.

Norway and other countries are turning to carbon capture and storage also for the production of so-called blue hydrogen from gas, a source of CO2. The administration in Brussels still accepts it as a transition technology. Green hydrogen is made from water in a process called electrolysis, usually powered by renewable sources.

If CO2 isn’t captured and stored, the fuel is defined as gray hydrogen.

Oil producers are exploring solutions like in the project in Norway for carbon capture and storage to drive costs below the price of greenhouse gas allowances

The price of carbon allowances recently topped EUR 30 per ton of carbon dioxide equivalent to hit the highest point in 14 years, while lowest costs of the available carbon capture and storage solutions are still more than two times higher.

Rival projects underway in UK, Netherlands

The Net Zero Teesside project in the United Kingdom was launched by OGCI Climate Investments with the ambition to reach the capacity of six million metric tons per year. The endeavor, which used to be called Clean Gas, is run by BP and its consortium made up of Eni, Equinor, Shell and Total.

The Port of Rotterdam Authority, Energie Beheer Nederland (EBN) and Nederlandse Gasunie are behind the Porthos project. Standing for Port of Rotterdam CO2 Transport Hub and Offshore Storage, it aims for annual carbon capture and storage of 2.5 million tons by 2023. The EU declared it a project of common interest.

MAN Energy Solutions was picked as a contractor and ExxonMobil and Shell are interested in capturing carbon in their nearby refineries.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

More than 330,000 Europeans died due to air pollution in 2023

More than 330,000 Europeans died due to air pollution in 2023

05 December 2025 - The EEA has determined that in 2023 there were 333,000 cases of premature death linked to exposure to particulate matter, ozone and nitrogen dioxide.

Wpd obtains wind power approvals in Greece for 225 MW

Wpd obtains wind power approvals in Greece for 225 MW

04 December 2025 - Wpd has won environmental approvals for a wind power project of 147.6 MW in Central Greece and one for 77 MW in Thrace

north macedonia skopje energy efficiency public buildings

North Macedonia plans energy renovation of 14 major public buildings

28 November 2025 - The authorities have prepared a plan for the reconstruction of buildings used by the state administration for the period 2025–2028

croatia zagreb zagrebacki holding loan IFC waste

Zagreb to invest EUR 56 million in waste management, low-emission machinery

28 November 2025 - Zagreb Holding (ZGH), the umbrella firm for the city's utility companies, has requested approval from the authorities for long-term borrowing