Electricity

China wants in on Crete power link, joins Minos solar project

Minos CSP Crete

Photo: Nur Energie

Published

November 14, 2019

Country

Comments

comments icon

0

Share

Published:

November 14, 2019

Country:

Comments:

comments icon

0

Share

China’s president Xi Jinping left Greece with 16 bilateral deals, after an official three-day visit, where the focus was placed on the most populous country’s massive Belt and Road Initiative for infrastructure, manufacturing and trade across Asia, Africa and Europe. The projects include the interconnection cable which is planned to be installed between Crete and Attica and a 50 MW concentrated solar power or CSP facility on the island.

Other agreements covered the framework for investment on the bilateral level, media, sports, transport, education, banking and agricultural products. On November 11, at the start of Xi’s return visit, his government expressed interest in purchasing a 20% stake in Ariadne. The endeavor worth EUR 1 billion is for two 328-kilometre high voltage direct current (HVDC) cables under the Sea of Crete and the Myrtoan Sea.

The entity is a subsidiary of Independent Power Transmission Operator SA, also known as IPTO or ADMIE. The project, aimed to be completed by 2023, would be joined by State Grid Corp. of China, according to the document. Chairman Wei Kou represented SGCC, which controls 24% of ADMIE.

Separately, it said it wants to boost the share. Wei met with Greek minister of energy Costis Hatzidakis and the transmission system operator’s chairman of the board and chief executive Manos Manousakis. SGCC has the preferential right to buy any stake that would be divested of.

The world’s second-largest economy agreed to cooperate in the construction of the Minos CSP power plant in Atherinolakkos near Sitia in the island’s east. It was developed by Nur Energie Ltd., which obtained the electricity licence in 2011. Minos stands for Minimum Intermittency Operating System. The deal was signed by Industrial and Commercial Bank of China Ltd. (ICBC), Energy China Group and construction firm Preneton Co. from Greece.

China Gezhouba Group International Engineering Co. Ltd. and Zhejiang Supcon Solar Technology Co. Ltd. are taking responsibility for EPC or engineering, procurement and construction. The solar power plant, covering 160 hectares in total, is designed to include a five-hour molten salt heat storage system.

It was the first time China’s current head of state came to Greece. Prime minister Kyriakos Mitsotakis went to China one week before. Xi asserted they are “natural partners” in the Belt and Road Initiative. Of note, Bank of China Ltd. is establishing a branch in Athens and ICBC is setting up a representative office, the two countries said.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

All set for construction of Široka draga wind park of 125.4 MW in BiH

All set for construction of Široka draga wind park of 125.4 MW in BiH

13 August 2024 - Local firm Imres Smart Greenergy signed the deal with the selected contractor on its Široka draga wind power project

montenegro lng terminal iap pipeline natural gas sahmanovic

IAP pipeline, LNG terminal are strategic projects for Montenegro – minister

12 August 2024 - The construction of an LNG terminal and the Ionian Adriatic Pipeline are strategic projects for the new Ministry of Mining, Oil and Gas

eps profit 2024 assembly report

Serbia’s EPS posts EUR 280.3 million profit for first half of 2024

12 August 2024 - Elektroprivreda Srbije has said that its net earnings were RSD 9.4 billion (EUR 80.3 million) higher than planned

Turkey promoting alternative Greece Cyprus power cable

Turkey promoting its alternative to Greece-Cyprus power cable

12 August 2024 - Last month Turkish warships chased away a vessel scanning the route for the Greece-Cyprus section of the Great Sea Interconnector