Renewables

Bids invited to produce wind resource assessment for Poklečani wind farm

Photo: Pixabay

Published

June 24, 2019

Comments

comments icon

0

Share

Published:

June 24, 2019

Comments:

comments icon

0

Share

Public power utility Elektroprivreda HZHB (EPHZHB) has invited bids to conduct a wind resource assessment for the Poklečani wind farm in the Posušje municipality, according to a notice on the company’s website. The estimated value of the contract is BAM 22,000 (about EUR 11,250).

The deadline to file bids to conduct wind resource assessment for the Poklečani wind farm is July 10, 2019, and offers will be opened the same day. The contract will be awarded to the lowest bidder, and the selected contractor will have eight months to complete the study, according to the notice.

Technical requirements for applicants are provided in the tender documentation, while financial requirements do not exist. Payment will be made 30 days after the completion of the job.

Concession agreement signed in 2014

EPHZHB was awarded a concession to build and operate the Poklečani wind farm five years ago, and the concession agreement was signed in June 2014, according to earlier reports. According to the agreement, the concessionaire is to build and operate 5 MW wind turbines on up to 36 locations at Poklečani.

In April 2010, the Government of the Federation of BiH (FBiH) adopted a decision for EPHZHB to “continue and intensify” preparations for building the Poklečani wind farm, with a capacity of 72 MW. According to that decision, the tentative deadline to complete the construction was end-2014.

According to previous reports, in March 2018, EPHZHB put into operation the Mesihovina wind farm, the first in Bosnia and Herzegovina, with an installed capacity of 50.6 MW. The wind farm’s construction was backed with a EUR 71 million loan from the German development bank KfW. The total value of the project was about EUR 82 million.

In July 2018, EPHZHB held a groundbreaking ceremony for the 66 MW Vrilo pump-storage hydropower plant on the Šuica sinking river in the Tomislavgrad municipality, which is expected to be put in operation in 2023.

EPHZHB General Manager Marinko Gilja said in November 2018 that the company would continue developing renewable energy facilities, including the Velika Vlajna/Jastrebinka wind farm, as well as with preparations for building small hydropower plants and solar power plants.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

Green for Growth Fund financial impact targets 2023

Green for Growth Fund tops its financial, impact targets in 2023

15 July 2024 - The Green for Growth Fund kept mitigating climate change and promoting sustainable economic growth last year in its 18 markets

IRENA La Camera renewables must grow higher speed scale

IRENA’s La Camera: Renewables must grow at higher speed, scale

12 July 2024 - IRENA's Director-General Francesco La Camera warned of ongoing patterns of concentration in geography in renewables deployment as well as against complacency

green steel electric vehicles study transport environment

Switching to green steel would add just EUR 8 per electric vehicle by 2040

11 July 2024 - Switching to 40% green steel would add just EUR 57 to the sticker price of an electric vehicle in 2030, according to an analysis by T&E

Albania declares eight winners at 300 MW solar power auction

Albania declares eight winners at 300 MW solar power auction

10 July 2024 - The lowest bid at Albania's solar power auction came in at EUR 39.7 per MWh, against a starting level of EUR 59.97 per MWh