Renewables

Fintel Energija decides to raise up to EUR 27.5 million through IPO

Photo: Pixabay

Published

April 23, 2018

Country

Comments

comments icon

0

Share

Published:

April 23, 2018

Country:

Comments:

comments icon

0

Share

Fintel Energija’s shareholders have reached a decision on a RDS 3.5 billion (EUR 27.5 million) capital increase through the initial public offer (IPO) the renewable energy company plans on the Belgrade Stock Exchange.

The IPO is to be carried out through a listing on the prime segment of the Serbian stock exchange’s regulated market.

“The shareholders’ meeting of the subsidiary Fintel Energija has decided on a capital increase in the maximum amount of RSD 3.25 billion (EUR 27.5 million) which corresponds to 6,500,000 newly issued shares to be issued at euro equivalent of RSD 500 per share,” the parent company, Italy’s Fintel Energia Group, said in a statement.

According to the Italian media, Fintel Energia Group expects to maintain a controlling interest in the Serbian company, whose IPO should be completed in the first half of the year.

Tiziano Giovannetti, CEO at Fintel Energia Group and MK-Fintel Wind, said in May last year that the company planned to offer 20% to 40% of Fintel Energija’s shares to raise about EUR 60 million.

A few days ago, Fintel Energija filed an application for the IPO with the Serbian Securities Commission. The company is also preparing a prospectus for its listing.

Fintel Energija is a subsidiary of Italy’s Fintel Energia Group. Fintel Energija and Serbia’s MK Group, owned by Serbian businessman Miodrag Kostić, are the owners of MK-Fintel Wind and MK-Fintel Wind Holding.

Eight wind farms in the pipeline

MK-Fintel Wind controls the 69 MW Košava phase 1 wind farm whose construction started in June last year. At the end of February, MK-Fintel Wind announced that it has secured EUR 81.5 million for the completion of the Košava phase 1 wind farm.

MK-Fintel Wind Holding owns the other wind farms in Serbia built by Fintel Energia Group and MK holding. To date companies opened a 9.9 MW Kula wind farm, Serbia’s first, at the end of 2015, and a 6.6 MW La Piccolina wind farm in October 2016. The company is in the process of constructing seven more wind farms in Serbia.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

ems ai transmission

Serbia’s TSO EMS plans to use AI in construction approvals

21 November 2024 - EMS has decided to automate its construction approval procedure by introducing state-of-the-art AI solutions

IPTO ENCS cybersecurity grid

Greece’s IPTO joins European Network for Cyber Security

21 November 2024 - The European Network for Cyber Security (ENCS) has announced that IPTO has officially joined the network as a full member

montenegro gvozd epcg nordex Ibrahim Özarslan

Montenegro’s power utility EPCG begins construction of Gvozd wind farm

21 November 2024 - Wind farm Gvozd will be the first large-scale power generation facility to be built by EPCG in more than 40 years

Bulgarian waterworks firm installs in pipe hydropower generator

Bulgarian waterworks firm installs in-pipe hydropower generator

21 November 2024 - A waterworks and sewerage firm in Bulgaria produces electricity using an in-pipe hydropower device in a supply line