Renewables

Works start to build 2nd biomass boiler in Priboj

Photo: GIZ

Published

September 5, 2018

Country

Comments

0

Share

Published:

September 5, 2018

Country:

Comments:

0

Share

The municipality of Priboj has started building a boiler to use wood chips as fuel, in what will improve heating supply for five public facilities and cut their heating costs.

The new 1.8 MW biomass boiler will supply heating to two elementary schools and two high schools, as well as primary health care facility, with the launch of operations expected in the second half of the upcoming heating season, according to a media conference held on the construction site in Priboj today.

“The construction of the second boiler to use wood chips as fuel represents the second phase of our strategic plan to replace the use of fossil fuels for district heating in the municipality of Priboj with biomass and secure safer, healthier, and cheaper heating for residents. The RSD 90 million in financial support for the construction of the new boiler came from the Public Investment Management Office of the Republic of Serbia, while technical assistance on the project was provided by German development organization GIZ,” said Deputy Mayor Saša Vasilić, according to a media release from GIZ.

In the first phase of the project to convert to biomass as fuel for district heating in Priboj, the boiler in the old part of the town, heating a school, a pre-school institution, a cultural center, and a municipal building, switched to pellets in 2016.

The environmental aspect of converting to renewable energy sources is indubitable, but what is also very important is that biomass is a locally sourced fuel, said Rainer Schellhaas GIZ DKTI’s Biomass Supply component leader, noting that this means that the money set aside for fuel is spent locally, helping drive the local community’s sustainable economic development.

The Priboj authorities have been taking an active part in the Development of a Sustainable Bioenergy Market in Serbia program as part of the German-Serbian Development Cooperation. The municipality is one of 10 to have signed an agreement last year to convert from fossil fuels to biomass for district heating. The construction of a new district heating plant in Priboj will start in the fall of 2019, according to the media release from the GIZ. According to Vasilić, this will help round off Priboj’s biomass district heating system.

The wider project to convert 10 heating plants to biomass is worth EUR 27 million, EUR 20 million of which is financed with a loan from German development bank KfW, which is also providing a EUR 2 million grant, and a EUR 5 million grant from the government of Switzerland, with the GIZ providing technical assistance.

Tags: , ,
Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

low carbon strategy serbia

Serbia adopts Low Carbon Development Strategy

07 June 2023 - The most expensive scenario for the country is to ignore the costs related to climate change, the document said

CAN Europe Western Balkan contries in preparing NECP national energy climate plan

CAN Europe: Western Balkans took little to no action in preparing NECPs

05 June 2023 - In 2021, the obligation to adopt NECPs was postponed until 2024 at the latest while the deadline for delivering drafts is June 30, 2023

International Congress on Process Industry Processing '23 serbia sabac

36th International Congress on Process Industry – Processing ’23. to be held on June 1-2 in Serbia

24 May 2023 - The two-day event will be held in Šabac, where domestic and foreign experts will present 65 papers classified into 11 thematic groups

Elektroprivreda Republike Srpske plans to burn waste in its TPP Gacko

Elektroprivreda Republike Srpske plans to burn waste in its Gacko coal plant

17 May 2023 - The power utility is planning a pilot project for burning up to 1,200 tons of waste per day together with coal in the Gacko facility