Renewables

Voltalia wins auction in Albania for Spitalla solar power plant of 100 MW

Voltalia auction Albania Spitalle solar power 100 MW

Photo: Ministry of Infrastructure and Energy

Published

March 26, 2021

Country

Comments

comments icon

0

Share

Published:

March 26, 2021

Country:

Comments:

comments icon

0

Share

French company Voltalia was selected for the construction of a 100 MW photovoltaic system in the municipality of Durrës in the west of Albania, on the Adriatic coast. The investor bid EUR 29.89 per MWh for the Spitalla solar park.

Five companies and consortiums participated in the renewable energy auction for the Spitalla solar power plant and Voltalia had the best offer, the Albanian Ministry of Infrastructure and Energy said. The French firm, which already has a contract for the Karavasta photovoltaic system, won at the auction with a bid of EUR 29.89 per MWh excluding value-added tax for 70% of production.

The deal is for 15 years and the remaining output from the 100 MW Spitalla solar park will be sold on the market or through bilateral arrangements or corporate power purchase agreements – PPAs. The government set the ceiling at EUR 55 per MWh and the bidders gave their lowest possible offers in the process.

Chinese group’s bit was far higher

The consortium of China’s Universa Energy and HOGN Electrical Group was the other competitor the final phase, with EUR 46. The Spitalla site spans 121 hectares.

No one expected such a low bid, according to Minister of Infrastructure and Energy Belinda Balluku

Minister Belinda Balluku praised the consultants from the European Bank of Reconstruction and Development for helping organize the auction. She said no one expected such a low bid. In comparison, Voltalia won the 140 MW Karavasta deal with EUR 24.89 per MWh. Albania, which gets 99% of its power from renewable sources, has an imperative to diversify them, Balluku stressed.

Two domestic firms participated in process for awarding contract for Spitalla solar park

The Balkan country depends on hydropower plants, making power supply vulnerable to droughts amid climate change. Two domestic firms participated in the auction together with an Indian bidder, while the remaining two companies were from Germany.

Of note, Voltalia recently submitted the non-technical summary of its environmental impact assessment to the authorities for Karavasta, located next to the largest lagoon in Albania. It said preparatory works would last three months and that it can build the utility-scale solar power plant on 196 hectares at the lot of 220 hectares in another eight months.

Balluku said earlier that the government would hold a wind power auction and a wind and solar auction after the one for Spitalla.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

bih wind farm ivovik

Ivovik, BiH’s largest wind farm, starts trial operation

22 January 2025 - The Ivovik wind farm, the fourth and largest in Bosnia and Herzegovina, has started trial operation

romania coal trump energy burduja

Burduja: Romanian coal power plants could be upgraded

22 January 2025 - In his view, US President Donald Trump has demonstrated to the world that democracies are only strong when their economies are strong

European People s Party proposes two year delay for CBAM

European People’s Party proposes two-year delay for CBAM

22 January 2025 - EPP said the Carbon Border Adjustment Mechanism (CBAM), EU taxonomy and corporate sustainability directives should be paused for two years

Clean Hydrogen Partnership call innovation research

Clean Hydrogen Partnership launches call for cutting-edge hydrogen technologies

22 January 2025 - The call addresses key priorities identified by the Strategic Research Agenda within different areas of research and innovation