Renewables

Kosovo* to launch pilot auction for solar power by year-end

Kosovo pilot auction solar power by year end

Photo: TheOtherKev from Pixabay

Published

March 14, 2022

Country

Comments

comments icon

0

Share

Published:

March 14, 2022

Country:

Comments:

comments icon

0

Share

Minister of Economy Artane Rizvanolli said Kosovo* would launch a pilot auction for solar power by the end of 2022.

After the inauguration of the Selac wind park, also known as Bajgora, Kosovo’s Minister of Economy Artane Rizvanolli said on Twitter that other renewable energy projects are coming.

“Many investors interested and many wind & solar projects coming with licenses issued based on competitive and transparent processees, securing the lowest price for consumers,” she wrote. Rizvanolli added that the first renewable energy auction in Kosovo* would be launched by the end of the year as a pilot for solar power. The European Bank for Reconstruction and development is assisting the government in preparing the procedure and rules.

Green energy projects piling up

As for known projects in the pipeline, government-controlled Kosovo Energy Corporation (KEK) is working on a 100 MW solar power project. The facility is intended to be built at what is now an ash dump for the Kosova A coal-fired thermal power plant.

Kosovo* has only one other wind farm – Kitka, with a capacity of 32.4 MW, which will be expanded by 20 MW. Bondcom Energy Point’s Budakova system is planned to have 46 MW. Another advanced project is for the 100 MW wind farm Çiçavica, developed by Akuo Energy.

Air Energy 2 intends to install two wind power plants of 34.8 MW each. StubllaEnergy is working on a hybrid power plant of 170 MW, of which 132 MW would be in wind turbines.

New wind farm accounts for 10% of installed capacity in Kosovo*

The 105 MW Selac wind farm is located near Mitrovica. It was built by SoWi Kosovo, a German-Israeli joint venture with local partners. The project was given a strategic investment status four years ago.

The wind power plant, backed by the EBRD, is worth more than EUR 170 million, the authorities said. The project is split into equal segments Selaci 1, 2 and 3. The first part was connected to the grid in late summer. Selac now accounts for 10% of the installed electricity generation capacity in Kosovo*, which is heavily dependent on coal and suffering amid the energy crisis.

“The green agenda is one of our government’s priorities, not only because it includes an important aspect of our EU integration process, but especially because we need to phase out coal, while maintaining our energy independence,” Prime Minister Albin Kurti said at the inauguration ceremony.

* This designation is without prejudice to positions on status and is in line with UNSCR 1244/99 and the ICJ Opinion on the Kosovo declaration of independence.
Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

Shopping mall operator break ground major solar power plant Romania

Shopping mall operator to break ground on major solar power plant in Romania

01 December 2024 - Monsson Group sold a 50 MW photovoltaic project in northwest Romania to shopping mall operator NEPI Rockcastl

croatia renewable energy projects hgk marija sculac

Around 40 renewable energy projects pending in Croatia

29 November 2024 - Power grid bottlenecks could jeopardize connecting new power plants to the system but also the operation of the ones already online

Serbia Energy Sector Development Strategy 2040 2050

What does Serbia’s new Energy Sector Development Strategy bring

29 November 2024 - The National Assembly in Belgrade passed the Energy Sector Development Strategy of Serbia up to 2040 with Projections up to 2050

EUSEW

EUSEW2025 awards applications are open

29 November 2024 - EUSEW awards are a recognition of the success of projects and the individual and collective efforts with outstanding results in energy efficiency and renewable energy