News

Embezzlement probe at wind power operators

Published

September 24, 2015

Comments

comments icon

0

Share

Published:

September 24, 2015

Comments:

comments icon

0

Share

Prosecutors from the National Anticorruption Directorate (DNA) Suceava conducted a search at headquarters of two companies in Bacău county for suspicion that European funds of EUR 2 million were embezzled, Romanian news agency Act Media reported. The exact amount will be established following evaluations on materials found, said DNA spokesperson Livia Săplăcan. The beneficiary of European funds for wind parks had carried out activities through intermediate firms, the authorities said. In the purchase of wind turbines from Aida Srl, part of the transaction was from Electro Metal, at the price of RON 43,400 (EUR 9,834), says an invoice issued by Kokotas Nicol Srl, investigators added. Some of the goods were bought by Electro Metal from Alternative Pure Energy, thre report adds.

Electro Metal delivered electric equipment worth EUR 35,350 from Alternative Pure Energy and Electrovolt to Kokotas Nicol. The goods were not sold again and there were no documents proving the debt was recovered, a fact creating doubts about the reality of those commercial relations, the article said. Alternative Pure Energy carried out direct commercial relations with Aida Srl, while Electro Metal and Kokotas Nicol were used as screen companies.

Related Articles

TAP gas pipeline examining possibility to blend in hydrogen

TAP gas pipeline examining possibility to blend in hydrogen

15 January 2025 - Trans Adriatic Pipeline (TAP) selected Penspen to evaluate the feasibility of introducing hydrogen blends into existing infrastructure

masdar solar battery baseload power project

Masdar reveals first solar, battery project for renewable baseload power

15 January 2025 - UAE-based renewable energy company Masdar announced a solar and energy storage project for the production of baseload electricity

Albania Italy undersea cable UAE strategic partner

Albania, Italy sign undersea cable deal with UAE as strategic partner

15 January 2025 - Albania, Italy and the UAE agreed to install an electricity interconnector under the Adriatic Sea between Vlora and Puglia

DTEK subsidiary DRI Glodeni 2 solar park Romania

DTEK’s subsidiary DRI completes Glodeni 2 solar park in Romania

14 January 2025 - DRI completed its second photovoltaic plant in Romania, Glodeni 2, and it is preparing to start the construction of another one