Renewables

Subsidies in Romania should last until solar panels are installed on last roof

Subsidies-Romania-solar-panels-are-installed-last-roof

Photo: Wirestock on Freepik

Published

January 8, 2024

Country

Comments

comments icon

0

Share

Published:

January 8, 2024

Country:

Comments:

comments icon

0

Share

Minister of Environment, Water and Forests Mircea Fechet expressed hope that subsidy schemes in Romania like Casa Verde Fotovoltaice wouldn’t stop until solar panels are installed on the last roof in the country.

Romania joined the group of gigawatt-scale markets in 2023 in terms of installed photovoltaic capacity within one year and the list of mature projects keeps getting longer. In fact, SolarPower Europe expects the country to reach 8.7 GW by 2027. The solar boom is fueled by all segments from prosumers to municipal authorities to transmission system operator Transelectrica.

The number of prosumers – households, firms and institutions – has surpassed 100,000, compared to just 1,634 at the end of 2020. The combined capacity of their installations is estimated at more than 1.4 GW.

The Casa Verde Fotovoltaice subsidy mechanism was blocked since September

Minister of Environment, Water and Forests Mircea Fechet bets on a further expansion. He told Radio România Actualități that the Casa Verde Fotovoltaice subsidy mechanism for households has been unblocked. Namely, a court suspended it in September after an installer filed a complaint for not being accepted to enter the program.

The issue was resolved amicably, Fechet stressed. “I hope we don’t stop financing such programs until we have a photovoltaic panel on the last roof in Romania,” he pointed out.

By the end of this week, the Environment Fund Administration (AFM) will sign its 90,000th contract, he claimed.

In the Casa Verde Fotovoltaice scheme, the government provides just above EUR 4,000 at most through AFM or up to 90% for photovoltaic facilities while the beneficiary covers the rest. Romania earmarked EUR 342 million for the program in 2023, the minister noted.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

energy storage battery europe

Europe’s energy storage capacity to reach 100 GW this year, more than double by 2030

21 November 2025 - Pumped hydropower has the largest share of existing energy storage, 50.6 GW, followed by batteries, with 44.8 GW

3rd Conference on Advancing Renewable Investments guarantees of origin could drive Europe green energy integration

3rd Conference on Advancing Renewable Investments – guarantees of origin could drive Europe’s green energy integration

21 November 2025 - As CBAM nears implementation, the Ljubljana conference highlighted the tools to accelerate integration with the EU, the Energy Community Secretariat said

montenegro admir sahmanovic energetika teska godina pljevlja potrosnja struje

Šahmanović: Montenegro is facing its most challenging year for energy sector

20 November 2025 - Priorities are price stability, increasing the use of renewables, and strengthening the country's position as an energy hub, Šahmanović said

Alcazar take over NIAT wind farm 500 MW in Egypt Siemens Gamesa after completion

Alcazar to take over NIAT wind farm of 500 MW in Egypt from Siemens Gamesa after completion

20 November 2025 - Alcazar formalized the partnership for the final development, construction and operation of Siemens Gamesa's NIAT wind project in Egypt