Renewables

Subsidies in Romania should last until solar panels are installed on last roof

Subsidies-Romania-solar-panels-are-installed-last-roof

Photo: Wirestock on Freepik

Published

January 8, 2024

Country

Comments

0

Share

Published:

January 8, 2024

Country:

Comments:

0

Share

Minister of Environment, Water and Forests Mircea Fechet expressed hope that subsidy schemes in Romania like Casa Verde Fotovoltaice wouldn’t stop until solar panels are installed on the last roof in the country.

Romania joined the group of gigawatt-scale markets in 2023 in terms of installed photovoltaic capacity within one year and the list of mature projects keeps getting longer. In fact, SolarPower Europe expects the country to reach 8.7 GW by 2027. The solar boom is fueled by all segments from prosumers to municipal authorities to transmission system operator Transelectrica.

The number of prosumers – households, firms and institutions – has surpassed 100,000, compared to just 1,634 at the end of 2020. The combined capacity of their installations is estimated at more than 1.4 GW.

The Casa Verde Fotovoltaice subsidy mechanism was blocked since September

Minister of Environment, Water and Forests Mircea Fechet bets on a further expansion. He told Radio România Actualități that the Casa Verde Fotovoltaice subsidy mechanism for households has been unblocked. Namely, a court suspended it in September after an installer filed a complaint for not being accepted to enter the program.

The issue was resolved amicably, Fechet stressed. “I hope we don’t stop financing such programs until we have a photovoltaic panel on the last roof in Romania,” he pointed out.

By the end of this week, the Environment Fund Administration (AFM) will sign its 90,000th contract, he claimed.

In the Casa Verde Fotovoltaice scheme, the government provides just above EUR 4,000 at most through AFM or up to 90% for photovoltaic facilities while the beneficiary covers the rest. Romania earmarked EUR 342 million for the program in 2023, the minister noted.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

Turkey adds 1 3 GW solar power capacity April alone

Turkey adds 1.3 GW in solar power capacity in April alone

17 May 2024 - Photovoltaic capacity in Turkey reached 13.9 GW by the end of last month or a stunning 1.3 GW more than on March 31

krivaca windfarm danube serbia alfi mk group

Krivača, first wind farm in Serbia south of Danube, officially starts production

16 May 2024 - MK Group and Alfi Renewables inaugurated their Krivača wind farm in Golubac in eastern Serbia

Serbia Hungary market coupling Mátyás Vajta Belgrade Energy Forum

Serbia, Hungary to start market coupling within weeks

15 May 2024 - An MoU on electricity market coupling between Hungary and Serbia will be signed within weeks, CEO of HUPX Mátyás Vajta announced at Belgrade Energy Forum

Greece directs EUR 50 million for small business transition in lignite regions

Greece earmarks EUR 50 million for small business transition in lignite regions

15 May 2024 - Western Macedonia and Megalopolis are the two traditional lignite regions of Greece. They are greening the local economy.