Renewables

Statkraft acquires water battery project near Loch Ness

Statkraft acquires water battery project near Loch Ness

Foto: Ingeborg from Pixabay

Published

December 19, 2023

Country

Comments

comments icon

0

Share

Published:

December 19, 2023

Country:

Comments:

comments icon

0

Share

Norwegian company Statkraft has acquired the Red John pumped storage hydro scheme in Scotland from Intelligent Land Investments Group (ILI), with an expected capacity of 450 MW. The project is located near Loch Ness, home to the legendary Loch Ness Monster, affectionately called Nessie.

The project was conceived in 2015 and received official approval from the Scottish Government in June 2021. The proposed pumped storage complex, 14 kilometers southwest of the city of Inverness, will store excess electricity from renewable sources. According to the company, it will help strengthen the security of energy supply and reduce fossil fuel use in Great Britain’s power grid.

Pumped storage hydropower plants are enormous water batteries

Pumped storage hydroelectric plants have two or more reservoirs at different elevations. When there is excess electricity in the grid, for instance when demand drops, it is used to pump water from the lower to the upper reservoir. When there is a shortage of electrical energy, water is released downhill into the lower reservoir, driving hydroelectric turbines.

Hydropower stations with pumps function like massive water batteries, offering a flexible means of storing excess energy generated from renewable sources.

“This significant UK renewable energy infrastructure project will support hundreds of jobs during construction and provide locally based permanent jobs once operational,” according to the press release.

The UK needs to provide financial support

“Statkraft is fully committed to supporting the UK in strengthening its energy security and helping to secure the economic benefits of the net zero transition,” said Kevin O’Donovan, the company’s country manager. However, an appropriate support mechanism is needed, he noted. O’Donovan argued that it is the responsibility of the British government to ensure that the Norwegian company moves into the next phase without uncertainty.

ILI’s CEO Mark Wilson stressed that the United Kingdom should implement incentives for long-term energy storage projects and strive to become a global leader in eliminating greenhouse gas emissions. He added there are pumped storage hydropower projects in the country with a total planned capacity of 5 GW.

In July, the Scottish government approved Drax Group’s 600 MW pumped storage hydropower project. The Cruachan pumped hydro plant with a capacity of 450 MW, operational since 1965, is carved into the mountain of Ben Cruachan. The new facility would be built next to it.

Drax has also urged the authorities to improve “the financial stabilization mechanism” and pointed out that no pumped storage hydropower plant has been built since 1984.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

Green for Growth Fund financial impact targets 2023

Green for Growth Fund tops its financial, impact targets in 2023

15 July 2024 - The Green for Growth Fund kept mitigating climate change and promoting sustainable economic growth last year in its 18 markets

IRENA La Camera renewables must grow higher speed scale

IRENA’s La Camera: Renewables must grow at higher speed, scale

12 July 2024 - IRENA's Director-General Francesco La Camera warned of ongoing patterns of concentration in geography in renewables deployment as well as against complacency

green steel electric vehicles study transport environment

Switching to green steel would add just EUR 8 per electric vehicle by 2040

11 July 2024 - Switching to 40% green steel would add just EUR 57 to the sticker price of an electric vehicle in 2030, according to an analysis by T&E

Albania declares eight winners at 300 MW solar power auction

Albania declares eight winners at 300 MW solar power auction

10 July 2024 - The lowest bid at Albania's solar power auction came in at EUR 39.7 per MWh, against a starting level of EUR 59.97 per MWh