Renewables

Romania to earmark EUR 2 billion in subsidies for prosumers

Romania-earmark-EUR-2-billion-subsidies-prosumers

Photo: Asurnipal / https://creativecommons.org/licenses/by-sa/4.0/legalcode

Published

March 10, 2023

Country

Comments

comments icon

0

Share

Published:

March 10, 2023

Country:

Comments:

comments icon

0

Share

Prime Minister Nicolae-Ionel Ciucă said subsidies for households to install solar power panels and become prosumers would be doubled to EUR 2 billion. Romania is also planning to replace 250,000 old vehicles by 2026 with the help of European funds.

Romania is under pressure to meet the deadlines for European grants and cheap loans for energy projects, as they must be completed by 2026. Like its neighbor Bulgaria, the country is attracting investments in renewables, nuclear power and adjusting the legal framework. The aim is to to strengthen energy independence, especially from Russian fossil fuels, and meet the European Union’s environmental and climate targets.

One of the most vibrant sectors in Romania’s energy transition are household photovoltaics. They are subsidized via the Casa Verde Fotovoltaice mechanism.

The Romanian Energy Regulatory Authority (ANRE) recently said it expects the number of prosumers to jump from just over 40,000 to 100,000 this year. There were only 303 households, firms and institutions with such a status at the end of 2019!

The expansion is set to keep pace with the new incentives. Prime Minister Nicolae-Ionel Ciucă suggested that the funds for Casa Verde Fotovoltaice would be doubled to EUR 2 billion and said it would be sufficient for up to 80,000 beneficiaries.

Furthermore, Minister of Environment, Water and Forests Barna Tánczos said that 250,000 polluting vehicles would be replaced by 2026. The Rabla program for vehicles older than 15 years is also funded from the National Recovery and Resilience Plan (NRRP or PNRR).

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

Greece second LNG terminal come online October 1

Greece’s second LNG terminal coming online on October 1

14 August 2024 - After a half-year delay, the Alexandroupolis LNG terminal is set to be commissioned on October 1, Bulgarian Minister Vladimir Malinov said

All set for construction of Široka draga wind park of 125.4 MW in BiH

All set for construction of Široka draga wind park of 125.4 MW in BiH

13 August 2024 - Local firm Imres Smart Greenergy signed the deal with the selected contractor on its Široka draga wind power project

montenegro lng terminal iap pipeline natural gas sahmanovic

IAP pipeline, LNG terminal are strategic projects for Montenegro – minister

12 August 2024 - The construction of an LNG terminal and the Ionian Adriatic Pipeline are strategic projects for the new Ministry of Mining, Oil and Gas

eps profit 2024 assembly report

Serbia’s EPS posts EUR 280.3 million profit for first half of 2024

12 August 2024 - Elektroprivreda Srbije has said that its net earnings were RSD 9.4 billion (EUR 80.3 million) higher than planned