Electricity

New Cypriot government’s first priority is to reduce electricity costs

New Cypriot government first priority reduce electricity costs

Photo: Presidency of the Republic of Cyprus

Published

March 2, 2023

Country

Comments

0

Share

Published:

March 2, 2023

Country:

Comments:

0

Share

The primary concern of the government of new Cypriot President Nikos Christodoulides is to reduce electricity costs, Minister of Energy, Commerce and Industry George Papanastasiou said. In the transitional period toward green energy, the country will have to use natural gas, he pointed out.

Minister of Energy, Commerce and Industry Natasa Pilides handed over the duty to her successor George Papanastasiou. The business executive received the portfolio as a member of new Cypriot President Nikos Christodoulides’s government.

“Without cheap energy, you cannot have a good and stable economy,” he stressed, adding that the cabinet’s primary concern is to lower electricity costs to help the industry and the economy. Cyprus needs to shift to green energy, Papanastasiou said.

Papanastasiou The results in the energy sector haven’t been so good, due to external factors

“However, until we get to green energy, we will have to go through a transition period in which we will use natural gas,” the minister pointed out. The fuel will probably come “from the region,” he asserted, apparently hinting at Israeli offshore gas, Phileleftheros wrote.

While the industry and trade are doing very well in Cyprus, the results in the energy sector haven’t been so good due to external factors, George Papanastasiou said. He vowed to make the goals realistic and measurable.

Pilides noted that the ministry has secured EUR 590 million for projects and grants for the period 2021-2027.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

drina-hydropower-plants

Court annuls environmental permit for Drina hydropower project

02 May 2024 - The construction of large hydropower plants on the Drina is facing new delays, after a court ruling to scrap the environmental permit for HPP Foča

el-dorado-electricity-imports-north-macedonia-rke

North Macedonia: ‘Solar El Dorado’ cuts electricity imports to 2.75%

02 May 2024 - In 2023, North Macedonia's new solar capacity increased by as much as 251% compared to 2022

EU-completing-Green-Deal-Industrial-Plan-Net-Zero-Industry-Act

EU completing Green Deal Industrial Plan as Net Zero Industry Act awaits go-ahead

01 May 2024 - The European Union's Net Zero Industry Act is about to come into force, completing legislative work within the Green Deal Industrial Plan

Dubravka Dedovic Djedovic Handanovic reappointed Serbia minister of energy mining

Dubravka Đedović Handanović reappointed as Serbia’s minister of energy, mining

30 April 2024 - Minister of Energy and Mining Dubravka Đedović Handanović is keeping her seat in the new cabinet while Minister of Environmental Protection Irena Vujović is also becoming deputy prime minister