Renewables

Macron: France can’t rely either on renewables or on nuclear power alone

Macron France solely renewables nuclear alone

Photo: Bruno Bensasson / Twitter

Published

September 23, 2022

Country

Comments

0

Share

Published:

September 23, 2022

Country:

Comments:

0

Share

President Emmanuel Macron inaugurated France’s first offshore wind park and promised to double the speed of permitting for renewables, but also to accelerate nuclear energy projects. “Only renewables or only nuclear power, that doesn’t work,” he pointed out.

France is set to present legislation next week intended to accelerate the administrative process for renewable energy projects including solutions for using locations such as parking lots and land next to highways. President Emmanuel Macron announced the plan as he inaugurated the country’s first offshore wind park and urged for the speed of permitting to be doubled.

The goal is for France to have 50 offshore wind parks by 2050 with a combined capacity of 40 GW. Faced with an electricity shortage, the government is also aiming to increase the total size of solar power plants by 10 times and double the capacity of onshore wind farms.

First offshore wind park in France took more than a decade to be built

The Saint-Nazaire offshore wind project took more than 10 years to be built, compared to six years for utility-scale solar projects. But Macron said the procedure for nuclear power plants needs to be accelerated, too.

France is planning to add six reactors to its nuclear power plant fleet

“Only renewables or only nuclear power, that doesn’t work,” he stressed. Macron unveiled a plan in February to install six more reactors. France normally depends on nuclear energy for two thirds of its power, but a series of breakdowns at such facilities recently made it a net electricity importer.

Saint-Nazaire facility to be commissioned by year-end

The 480 MW Parc éolien en mer du Banc de Guérande offshore Saint-Nazaire on the country’s west coast consists of 80 wind turbines. The power plant is scheduled to be fully connected to the grid and commissioned by the end of the year.

It is owned by a consortium comprising EDF Renewables and Enbridge’s subsidiary EIH, while CPP Investments also holds a stake. The partnership is also developing a 500 MW offshore wind project Fécamp, already under construction together with wpd from Germany. Iberdrola is building its 496 MW Saint-Brieuc wind park in the English Channel.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

Carbon capture still no alternative decarbonizing cement industry

Carbon capture still has no alternative for decarbonizing cement industry

07 May 2024 - Cement has no credible alternatives for decarbonization without carbon capture, utilization and storage (CCUS), Carbon Tracker found

Turkey-based-Yildirim-109-MW-solar-park-Kosovo-ferronickel

Turkey-based Yıldırım building 109 MW solar park in Kosovo* for its ferronickel plant

07 May 2024 - Yıldırım Energy marked the start of construction works on a 150 MW solar farm in Kosovo*. It will supply the group's ferronickel plant.

Slovenia coal plant TES close already within three years

Slovenia’s coal plant TEŠ could close already within three years

06 May 2024 - Slovenian Prime Minister Robert Golob said coal plant TEŠ and its accompanying mine may end operations before the expected closure in 2033

data-center-microsoft-renewable-capacity

Microsoft signs biggest-ever corporate PPA for green energy

06 May 2024 - The deal between Microsoft and Brookfield is almost eight times as big as the largest single corporate power purchase agreement ever signed