Renewables

INA asks for bioethanol project to be granted strategic investment status

INA-bioethanol-investment

Photo: Miscanthus (Pixabay)

Published

June 24, 2020

Country

Comments

0

Share

Published:

June 24, 2020

Country:

Comments:

0

Share

The Croatian oil and gas company INA filed a request for a second-generation bioethanol project to be granted the status of the country’s strategic investment.

The estimated value of the investment is EUR 250 million. A part of the funds could be secured by the Innovation Fund of the European Union.

The support of the EU and the Government of the Croatia are key preconditions for the implementation of the project

The support of the EU and the Croatian government are key preconditions for the realization of the project, which fits into the European Green Deal and the European energy strategy, said Sándor Fasimon, President of the Management Board of INA.

The request was submitted to the Ministry of Economy, Entrepreneurship and Crafts

The Biorefinery project is part of a plan to transform the Sisak oil refinery into an industrial center.

A request to declare the second-generation bioethanol project the country’s strategic investment was submitted to the Ministry of Economy, Entrepreneurship and Crafts.

INA signed a license agreement with French group AXENS in February

As a first step in building the bioethanol plant, INA signed a license agreement with the French group AXENS for FuturolTM technology in February.

In late January, the Belgian company De Smet Engineers & Contractors (DSEC) announced that it had begun preparing a base design for ancillary facilities and the integration of existing refinery infrastructure.

Belgium’s DSEC announced it has started working on basic engineering for the outside battery limits or OSBL portion of a project.

Locally grown miscanthus will be used for feedstock

Locally grown miscanthus will be used for feedstock. Analysis after the harvest in Croatia confirmed that miscanthus could be used for INA’s bioethanol project.

Tags: ,
Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

europe flexibility seasonal balancing iea report

Flexibility needs to be met by demand response, batteries, hydrogen, but also thermal, hydropower plants – IEA

03 May 2024 - The report Managing the Seasonal Variability of Electricity Demand and Supply analyzes the situation in Europe, India, and Indonesia

IPTO suspends all electricity imports until May 7 to protect the Greek system

Greece suspends electricity imports until May 7 to protect system

03 May 2024 - The Greek Independent Power Transmission Operator (IPTO) has announced the suspension of all electricity imports during the hours around noon

Two agrosolar power plants are planned to be constructed in Serbia

Two agrisolar projects launched in northern Serbia

02 May 2024 - In the vicinity of Kikinda in Serbia, two new agrisolar projects are underway: Solar Power Plant Delta and Brankov solar

el-dorado-electricity-imports-north-macedonia-rke

North Macedonia: ‘Solar El Dorado’ cuts electricity imports to 2.75%

02 May 2024 - In 2023, North Macedonia's new solar capacity increased by as much as 251% compared to 2022