Energy Efficiency

EUR 1.4 million contract signed for energy renovation of hospital in Bar, walk-in clinic in Ulcinj

Photo: Signing ceremony (Government of Montenegro)

Published

November 1, 2019

Country

Comments

comments icon

0

Share

Published:

November 1, 2019

Country:

Comments:

comments icon

0

Share

As part of the second phase of the Montenegro Energy Efficiency Project (MEEP), health minister Kenan Hrapović and economy minister Dragica Sekulić have signed a EUR 1.4 million contract with a consortium of LD Gradnja, Ramel and Ening to implement energy efficiency measures at the General Hospital of Bar and Walk-In Clinic Ulcinj.

The contract refers to energy renovation, including the replacement of the windows and doors, the installation of thermal insulation on the facade and roofs, the replacement and improvement of the system for the preparation of sanitary hot water, as well as the modernization of the lighting and heating systems.

So far, around EUR 7.5 million has been invested in healthcare facilities under this project, while expenditures for energy have been reduced by about EUR 500,000 a year, Hrapović said.

New tendering for energy renovation worth EUR 1.1 million will be launched very soon

He said that tendering for a EUR 1.1 million energy renovation of the Psychiatric Hospital of Kotor, Special Hospital Vaso Ćukovic in Risan, and Walk-In Clinic Tivat is planned in the next few days.

Economy minister Dragica Sekulić said that in 2009 the ministry started implementing the Montenegro Energy Efficiency Project, which is financed from a loan provided by the International Bank for Reconstruction and Development (IBRD). The project aims to improve the energy performance of public facilities (in the health and education sectors), as well as to raise public awareness about energy efficiency measures.

In 25 renovated facilities, energy consumption has been reduced by 42.5% on average

So far, 25 public buildings have been renovated – 16 health facilities, eight educational facilities, and one student dormitory – in a EUR 9.58 million investment. Energy consumption has decreased on average by 42.5% and expenditures by around EUR 600,000 per year.

Sekulić said that the second phase of the Montenegro Energy Efficiency Project began in July 2018, when a EUR 6 million loan agreement was signed with the IBRD. In the second phase, in addition to energy renovation, a monitoring system will be introduced, to monitor the achieved savings and establish a sustainable system of financing energy efficiency projects in the public sector.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

Too hot to cope: Why cooling must become Europe’s next social right

Too hot to cope: Why cooling must become Europe’s next social right

17 April 2026 - Europe is getting dangerously hotter, and as millions struggle with rising temperatures, bills, and health risks, access to cooling must become a social right.

bih ebrd loan canton energy efficiency

BiH canton to invest EUR 16 million in energy efficiency

16 April 2026 - The investment is intended for energy renovation of public buildings, predominantly educational and health institutions

Warm Assendorp energy community

Warm homes, lower bills, stronger EU: the power of citizen-led energy networks

15 April 2026 - Community-led heating and cooling networks can lower costs, boost comfort, and support the EU’s transition to clean, locally produced energy.

North Macedonia Integrated National Energy and Climate Plan 2025 2030 NECP

North Macedonia adopts Integrated National Energy and Climate Plan 2025-2030

14 April 2026 - North Macedonia's new NECP, covering the period from 2025 to 2030, brings 61 measures for a strong renewables growth and European standards