Renewables

BiH produces Draft catalog of criteria for sustainable development of SHPPs

hydropower Draft catalog for sustainable development of small hydropower plants in BiH

Published

October 30, 2019

Comments

0

Share

Published:

October 30, 2019

Comments:

0

Share

A working group comprising representatives of various institutions and both political entities in Bosnia and Herzegovina, with technical support from GIZ, has produced a Draft catalog of criteria for a sustainable development of small hydropower plants (SHPPs) in the country, inviting all stakeholders to send questions and comments. The catalog contains a large number of criteria, divided into five chapters – Energy, Water Management, Spatial Planning, Water Ecology, and Nature Protection.

The decision to produce the Draft catalog was based on the fact that environmental and local socioeconomic impacts of the hydropower sector can be significant, and that the selection of potential locations for the construction of SHPPs must follow clearly defined criteria which cover various factors of sustainability and areas of impact, according to a statement from Republika Srpska’s Ministry of Energy and Mining.

The ministry also noted that the hydropower sector is one of the most complex sectors in BiH in terms of regulations and the separation of jurisdictions between the state, entities, cantons, and municipalities.

The document is available for download and viewing, and all stakeholders are invited to send questions and comments via email to n.milovcevic@mier.vladars.net by November 20, 2019.

Catalog aims to mitigate environmental and socioeconomic impacts of SHPPs

One of the main objectives of the catalog is to raise awareness about the significance of sustainable development and the need to mitigate environmental and socioeconomic impacts related to the construction of SHPPs, according to the statement.

The purpose of the catalog is also to promote strategic and sustainable planning in the process of SHPP construction, provide the groundwork for consultants and investors to assess the eligibility of projects in the early stage of planning, as well as to create a regulatory framework for decision makers in the field of permitting, licensing and granting concessions for the construction and operation of SHPPs.

Due to their adverse impacts on the environment and local communities, the construction of SHPPs has been attracting a lot of public attention and meeting with strong resistance across the region, among ordinary people as well as civil society organizations and experts. According to earlier reports, there are currently 65 SHPPs in BiH.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

drina-hydropower-plants

Court annuls environmental permit for Drina hydropower project

02 May 2024 - The construction of large hydropower plants on the Drina is facing new delays, after a court ruling to scrap the environmental permit for HPP Foča

el-dorado-electricity-imports-north-macedonia-rke

North Macedonia: ‘Solar El Dorado’ cuts electricity imports to 2.75%

02 May 2024 - In 2023, North Macedonia's new solar capacity increased by as much as 251% compared to 2022

EU-completing-Green-Deal-Industrial-Plan-Net-Zero-Industry-Act

EU completing Green Deal Industrial Plan as Net Zero Industry Act awaits go-ahead

01 May 2024 - The European Union's Net Zero Industry Act is about to come into force, completing legislative work within the Green Deal Industrial Plan

Dubravka Dedovic Djedovic Handanovic reappointed Serbia minister of energy mining

Dubravka Đedović Handanović reappointed as Serbia’s minister of energy, mining

30 April 2024 - Minister of Energy and Mining Dubravka Đedović Handanović is keeping her seat in the new cabinet while Minister of Environmental Protection Irena Vujović is also becoming deputy prime minister