Electricity

EPCG shareholders approve investment in Gvozd wind farm project

Masdar Mubadala MDG Taaleri PPC Renewables Kurbin

Photo: Pixabay/josealbafotos

Published

September 2, 2019

Country

Comments

comments icon

0

Share

Published:

September 2, 2019

Country:

Comments:

comments icon

0

Share

Shareholders of state power utility Elektroprivreda Crne Gore (EPCG) have approved an investment into a joint EUR 58 million project with Austria’s Ivicom Holding to build the Gvozd wind farm, RTCG reported following a meeting of EPCG’s shareholders.

Ivan Mrvaljević, head of development and engineering at EPCG, said earlier this year that EPCG could launch construction on the Gvozd wind farm in 2020, and that the wind farm was expected to go on stream in 2022, according to earlier reports.

In 2018, EPCG signed a memorandum of understanding with Ivicom Holding concerning the project to build the 50 MW Gvozd wind farm, which is planned to produce 140 GWh of electricity annually.

At the time, EPCG said that financing for the wind farm project on the Gvozd-Krnovo location in the municipality of Nikšić would be in the form of loans, for the most part drawn from international finance institutions (IFI), and that feed-in tariffs are not planned for this project.

EPCG made EUR 60 million profit in 2018

At the meeting, EPCG shareholders noted that 2018 was one of the most successful years in the company’s history, and that EPCG made a profit of about EUR 60 million.

According to EPCG, its capital investments in 2018 totaled around EUR 14.3 million, with most of the money going towards modernization and new projects.

EPCG’s overall electricity production in 2018 was 3,484.2 GWh, a 59% increase compared with the 2017 output, and 16% above plan, according to a report by CDM.

When it comes to hydroelectric power, both hydropower plants (HPPs) operated by EPCG saw an increase in output against the previous year. HPP Perućica generated 1,042.3 GWh of electricity last year, or 481.0 GWh more than it did in 2017, while HPP Piva boosted its electricity production by 633.4 GWh against 2017, to 993.9 GWh, according to the report.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

ems ai transmission

EMS plans to use AI in construction approvals

21 November 2024 - EMS has decided to automate its construction approval procedure by introducing state-of-the-art AI solutions

IPTO ENCS cybersecurity grid

Greece’s IPTO joins European Network for Cyber Security

21 November 2024 - The European Network for Cyber Security (ENCS) has announced that IPTO has officially joined the network as a full member

montenegro gvozd epcg nordex agreement

Montenegro’s power utility EPCG begins construction of Gvozd wind farm

21 November 2024 - Wind farm Gvozd will be the first large-scale power generation facility to be built by EPCG in more than 40 years

Bulgarian waterworks firm installs in pipe hydropower generator

Bulgarian waterworks firm installs in-pipe hydropower generator

21 November 2024 - A waterworks and sewerage firm in Bulgaria produces electricity using an in-pipe hydropower device in a supply line