Renewables

Turkey global leader in new geothermal capacity in 2018, Croatia sixth

Turkey geothermal

Photo: Kizildere III (Zorlu Enerji)

Published

June 28, 2019

Country

,

Comments

comments icon

0

Share

Published:

June 28, 2019

Country:

,

Comments:

comments icon

0

Share

Turkey was the global leader in adding new geothermal capacity in 2018, with 219 MW. Croatia was sixth worldwide, with 17.5 MW.

Turkey completed several geothermal power projects in 2018, raising its installed capacity by 21% or 219 MW, to 1.3 GW, according to a report by think tank Renewable Energy Policy Network for the 21st Century Report (REN21).

Turkey ranks fourth globally for cumulative geothermal power capacity, having built up more than 1 GW of capacity in only six years, between 2013 and 2018, according to the Renewables 2019 Global Status Report.

An estimated 0.5 GW of new geothermal power generating capacity came online in 2018, bringing the global total to around 13.3 GW. Turkey and Indonesia remained the leaders for new installations and accounted for about two-thirds of the new capacity installed.

65.5 MW unit at Kizildere III plant – largest single unit completed in Turkey in 2018

The largest single unit completed in 2018 was the 65.5 MW Unit 2 at the Kizildere III plant, which became Turkey’s largest geothermal power plant (165 MW) as a result.

Photo: Kizildere III (Zorlu Enerji)

Other projects completed during the year include the 19.4 MW Baklaci, the 13.8 MW Buharkent, the 25 MW 3S Kale, and the 32 MW Pamukören Unit 4.

A final addition, the 30 MW Alsehir Unit 3, joined Turkey’s fleet in November, the report notes.

The majority of Turkey’s geothermal power plants use binary-cycle technology, as do all of the country’s plants under construction.

Conversely, most existing geothermal plants around the world use flash- or dry-steam technologies, which are suitable for high-temperature resources. Globally, binary-cycle technology has been

the fastest-growing technology in recent years, due in part to the rising use of relatively low-temperature resources.

Velika Ciglena puts Croatia on world’s top 10 geothermal list

Croatia completed its first geothermal power plant in 2018, ranking sixth worldwide for new capacity. The 17.5 MW Velika Ciglena plant is a project of Turkey’s MB Holding.

Croatia plans further development of geothermal resources in an effort to boost the share of renewables in its energy mix.

Global geothermal investment reaches USD 2.2 billion in 2018

Global investment in the geothermal sector in 2018 amounted to an estimated USD 2.2 billion.

Other countries that added capacity in 2018 (ordered by scale) were the United States, Iceland, New Zealand, Croatia, the Philippines, and Kenya.

At year’s end, the countries with the largest amounts of geothermal power generating capacity were the United States, Indonesia, the Philippines, Turkey, New Zealand, Mexico, Italy, Iceland, Kenya, and Japan.

Total geothermal energy output in 2018 was estimated at 630 PJ, with around half of this in the form of electricity (89.3 TWh).

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

Greece DEPA Commercial financing 816 MW solar power portfolio

Greece’s DEPA Commercial obtains financing for 816 MW solar power portfolio

26 July 2024 - State-controlled DEPA Commercial received a EUR 390 million loan from the EIB for photovoltaic projects across Greece

serbia energy cooperative solar power plant elektropionir

First cooperative solar power plants in Serbia start production

26 July 2024 - The income from the sale of electricity will be used for projects proposed by the communities of the villages on the Stara planina mountain

faria renewables mykonos solar power plant

Faria Renewables acquires 35 MW Mykonos solar project

26 July 2024 - Faria Renewables S.A. has announced the integration of photovoltaic project Mykonos into its asset portfolio

Ameresco Sunel Energy 560 MW solar power Greece Lightsource bp

Ameresco Sunel Energy starts building 560 MW solar power plant in Greece for Lightsource bp

26 July 2024 - Ameresco Sunel Energy is the contractor in Lightsource bp's solar power project of 560 MW in peak capacity, in the central part of Greece