News

Gruevski, Peševski visit first biogas power plant

Published

August 14, 2015

Comments

comments icon

0

Share

Published:

August 14, 2015

Comments:

comments icon

0

Share

Arben Abdurahmani, owner of the Vezë Sharri company based in Treboš near Tetovo in Macedonia’s northwest, spoke with prime minister Nikola Gruevski and deputy prime minister Vladimir Peševski about the pro-business regulation being introduced and the way it is affecting his large chicken farm and biogas power plant Elektro Sharri. Abdurahmani said that, since he brought German capital in 2000 to open his meat-processing plant and eventually a large poultry farm, he has seen major improvements in the ease of developing real-estate and relaxing the rules for hiring workers, the government said on its website.

The company was helped by the government, among other things in the approval of the feed-in tariff scheme that allowed it to develop the biogas-fuelled power plant, Abdurahmani said. Vezë Sharri was the first company to build such a facility, one that uses waste produced by the farm and other farms to produce electricity, which can not only power the farm, but can also be sold into the distribution network for a profit.

“We stopped throwing anything away. The entire waste we produce is used in the plant, and we even collect waste from other farms, and transform it into biogas. Finally, we turn it into fertilizer that we export to Germany,” Abdurahmani said.

Related Articles

YESS Power rolls out 1.5 GWh regional portfolio after landmark BESS project in North Macedonia

16 April 2026 - Business Development Executive of YESS Power Emre Jabban detailed the Turkish company’s current pipeline of over 1.5 GWh for Balkan Green Energy News alongside the challenges in conducting large-scale storage projects

Vestas to supply wind turbines for Strazhitsa project in Bulgaria

Vestas to supply wind turbines for Strazhitsa project in Bulgaria

15 April 2026 - Vestas has received an order to supply eleven EnVentus V162-6.4 MW wind turbines for the Strazhitsa project in Bulgaria

romania grid connection approvals speculative bolojan

Romania moves to crack down on ‘speculative’ grid connection approvals

15 April 2026 - Romanian Prime Minister Ilie Bolojan has called for tighter grid connection rules, claiming that 90% of issued approvals are for “speculative" projects

Warm Assendorp energy community

Warm homes, lower bills, stronger EU: the power of citizen-led energy networks

15 April 2026 - Community-led heating and cooling networks can lower costs, boost comfort, and support the EU’s transition to clean, locally produced energy.