Renewables

Greece’s first wind turbine factory starts production

Photo: Eunice Energy Group

Published

August 8, 2018

Country

Comments

comments icon

0

Share

Published:

August 8, 2018

Country:

Comments:

comments icon

0

Share

The first Greek wind turbine factory, operated by Eunice Wind, has launched production in the town of Mandra in the west of Attica, some 30 km from Athens, Greek news agency ANA-MP reported. Eunice Wind is part of Eunice Energy Group.

The factory manufactures EW-16 THETIS, the small wind turbine with a rated power of 50 kW, with the capacity of 50 wind turbines a year and possibility to boost production by some 30%.

The international markets and economies are sending the message that the era of centralized power production is over, said Giorgos Pechlivanoglou, head of Eunice Wind.

One can no longer talk about a producer and a simple consumer but has to start thinking about partnerships between producers, consumers, and the creation of the prosumer, Pechlivanoglou said, ANA-MP reported.

Designed in Germany, EW-16 THETIS is an advanced and reliable three-bladed horizontal-axis Small Wind Turbine (SWT), upwind orientated, certified under the IEC 61400-2 standard, according to Eunice Energy Group’s website.

The tubular steel tower is available for hub heights of 22 and 30 meters. The 30-meter version consists of two segments; while the shorter tower has only one segment, the group says on its website.

Eunice Energy Group is part of the TILOS project, the innovative hybrid, renewable energy-based battery station and smart microgrid project.

The island Tilos switched from oil-based electricity from neighboring Kos via an undersea cable that is vulnerable to faults to wind and solar power by installing a single wind turbine, a small scale photovoltaic park and an integrated battery storage system. The project secures up to 75% of the island energy needs.

Eunice Energy Group signed a contract for selling electricity with the Hellenic Electricity Distribution Network Operator (HEDNO).

The TILOS project was a double winner of the EU Sustainable Energy Week (EUSEW) Awards 2017. It was the first ever winner of the Energy Islands Award and the winner of the Citizens’ Award.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

bih republic of srpska hydropower plants bistrica tunnels petar djokic

Three hydropower plants on Bistrica river to be finished by end-2026

18 April 2025 - Chinese company AVIC is in charge of building the three hydropower plants on the Bistrica, with a total capacity of 39 MW

albania france kesh afd drin hydropower energy storage

Albania’s KESH, France’s AFD sign MoU on hydropower management, energy storage 

18 April 2025 - KESH and Agence Française de Développement have signed an MoU on the Drin cascade management and advanced energy storage planning

bih federation ephzhb court poklecani urban permit arhaus

Supreme Court of Federation of BiH annulls urban permit for Poklečani wind farm

17 April 2025 - The project is being developed by Elektroprivreda HZHB, one of the three state-owned power utilities in Bosnia and Herzegovina

Minister Admir Sahmanović formally assumes energy, mining portfolio in Montenegro

Minister Admir Šahmanović formally assumes energy, mining portfolio in Montenegro

17 April 2025 - Minister of Energy and Mining of Montenegro Admir Šahmanović was formally voted in as the two ministries that he ran were merged