Renewables

MK Fintel Wind secured loan for Košava wind farm

Photo: Pixabay

Published

March 1, 2018

Country

Comments

comments icon

0

Share

Published:

March 1, 2018

Country:

Comments:

comments icon

0

Share

MK Fintel Wind has announced that it has secured EUR 81.5 million for the completion of Košava Phase 1 wind park near Vršac in Serbia. MK Fintel Wind is owned by Italy’s Fintel Energia Group and Serbia’s MK holding, whose owner is businessman Miodrag Kostić, has already built two wind farms in Serbia.

The construction of the wind farm, which began in June 2017, is worth a total of EUR 117 million, and EUR 81.5 million will be financed by loans from Erste Bank Group, Erste Bank Serbia, Austrian Development Bank, Unicredit Bank Serbia and Zagrebačka Banka.

Fintel Energija, Serbian subsidiary of Fintel Energia Group, had previously received a loan from Serbian AIK Bank for the Phase 1 wind farm. Košava Phase 1 includes 20 wind turbines totaling 69 MW of power capacity.

“At the construction of the Košava wind farm, one hundred people will be hired, and thanks to them and the expertise and experience of local companies, we expect the wind farm to start operating by the end of 2019,” Fintel Energia Group and MK Fintel Wind CEO Tiziano Giovannetti said.

He noted that Fintel Energija is planning to conduct an initial public offer (IPO) on the Belgrade Stock Exchange, and the funds that will be collected will be used for the Phase 2 of the Košava wind farm.

The Phase 2 includes 19 wind turbines with a total power of 78.2 MW, while the construction should begin in early 2019.

“The next step is the IPO of Fintel Energija expected for April on the Belgrade Stock Exchange,” Giovannetti said.

According to the announcement, Košava wind farm will supply electricity from renewable energy sources to 57,000 households reducing CO2 emissions by 170,000 tons per year.

At the end of 2015 MK Fintel Wind opened a 9.9 MW Kula wind farm, the first in Serbia, and in October 2016 in Zagajica near Vršac 6.6 MW La Piccolina wind park.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

ems ai transmission

EMS plans to use AI in construction approvals

21 November 2024 - EMS has decided to automate its construction approval procedure by introducing state-of-the-art AI solutions

IPTO ENCS cybersecurity grid

Greece’s IPTO joins European Network for Cyber Security

21 November 2024 - The European Network for Cyber Security (ENCS) has announced that IPTO has officially joined the network as a full member

montenegro gvozd epcg nordex agreement

Montenegro’s power utility EPCG begins construction of Gvozd wind farm

21 November 2024 - Wind farm Gvozd will be the first large-scale power generation facility to be built by EPCG in more than 40 years

Bulgarian waterworks firm installs in pipe hydropower generator

Bulgarian waterworks firm installs in-pipe hydropower generator

21 November 2024 - A waterworks and sewerage firm in Bulgaria produces electricity using an in-pipe hydropower device in a supply line