Rio Tinto buying land for Serbia lithium mine before investment decision
Vučić hinted at holding a local referendum on letting Rio Tinto mine lithium. Activist Marija Alimpić said 36 families already sold their properties and left.
Tuzla 7 coal plant project in BiH sunk by GE’s exit, officials reveal
Unnamed sources said the construction of unit 7 in thermal power plant Tuzla most probably won't proceed as GE decided not to supply the equipment
Carbon border tax to be imposed on steel, iron, cement, fertilizers, aluminium, electricity – leaked draft
The European Commission is considering a transitional period of three years for fully implementing CBAM, from 2023 until 2026.
People in lignite areas in Greece will be able to buy bonds for solar projects
PPC intends to offer residents of the two coal-reliant regions in Greece to invest in its energy transition projects, reportedly with yields of up to 7% per year
Two Bulgarian coal power plants to be converted to natural gas, hydrogen
The Varna TPP has signed a contract to install two gas-fired units while the Bobov Dol TPP plans a conversion to gas and hydrogen.
Hungary, Russia to speed up construction of Paks II nuclear power plant
Hungary intends to expand its 2,000 MW Paks nuclear power plant with two units of 1,200 MW each and replace all four units that are currently in operation.
Third big solar power project without subsidies enters pipeline in Albania
An application was accepted for a 50 MW solar power plant in Fier in Albania, the third such project in the same area that won't be subsidized
Energy transition in Serbia kicks off – challenges in planning, implementation
Serbia’s decision to halt the construction of thermal power plant Kolubara B is the country’s first serious step in the energy transition.
Recent Comments