Electricity

Serbia to couple electricity market with EU by 2026 – SEEPEX

Serbia to couple electricity market with EU by 2026 SEEPEX stojcevski

Photo: Foto: Boban Ristić/Chamber of Commerce and Industry.

Published

March 1, 2024

Country

Comments

comments icon

0

Share

Published:

March 1, 2024

Country:

Comments:

comments icon

0

Share

If all the preparations go as planned, the Serbian electricity market could be coupled with the single European electricity market in 2026, Chief Operating Officer of SEEPEX Dejan Stojčevski said at a workshop on the models of the industry’s participation in the electricity market.

The coupling of the day-ahead and intraday markets at SEEPEX with the single EU market would further improve the conditions for the industry, as a consumer, and for electricity producers to enter the market.

It is also the next step in the development of the electricity market in Serbia, according to the participants of the workshop, organized by SEEPEX and the Chamber of Commerce and Industry.

According to Stojčevski, market coupling will bring various advantages, including an increase in the security of supply and the establishment of a regional benchmark price. It will also boost market liquidity, facilitate the integration of renewable sources and investment in the sector and secure the placement of electricity in the market.

The introduction of 15-minute trading is mandatory

To allow for market coupling, there are several necessary steps, as Stojčevski explained. The first one is the transposition of EU regulations, primarily the Guideline on Capacity Allocation and Congestion Management (CACM Regulation), followed by obtaining a full membership within the framework of Single Day-Ahead Coupling (SDAC) and Single Intraday Coupling (SIDC) and determining the local implementation project (LIP).

The market coupling itself involves contract signing, testing and the introduction of new roles, all of which SEEPEX has already initiated, Stojčevski stressed.

Rolling out a 15-minute trading interval is mandatory, he said and added that the country’s transmission system operator Elektromreža Srbije (EMS) is preparing it. Stojčevski estimated it could be implemented next year.

According to Stojčevski, allowing negative prices is not mandatory but it is desirable for market coupling.

If the transposition is completed by the end of the year, the coupled day-ahead market could become operational in the first quarter of 2026, while the intraday market would come online in the fourth quarter of 2026, Stojčevski said.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

montenegro epcg solar gradnja solar power plants

EPCG Solar Gradnja installs 36 MW of solar power in 2025

15 December 2025 - EPCG Solar Gradnja specializes in the procurement, design, installation, and maintenance of photovoltaic systems

world ember bess solar energy storage cost capex lcos

Solar power has become dispatchable anytime at low cost

15 December 2025 - Ember’s assessment of energy storage costs is based on recent auctions in Italy, Saudi Arabia and India and on expert interviews

AI and Energy: the dynamic duo shaping the power grid

AI and Energy: the dynamic duo shaping the power grid

15 December 2025 - How artificial intelligence is reshaping power grids, enabling renewable energy integration while raising regulatory, ethical and sustainability challenges.

nova bess romania battery

Romania’s biggest battery system put into operation

13 December 2025 - Nova Power & Gas has commissioned a battery energy storage system with an operating power of 200 MW and a capacity of 400 MWh