Energy Efficiency

Resalta implements one of largest, newest energy monitoring systems in Bulgaria for Serdika Center

Photo: Resalta

Published

November 15, 2018

Country

,

Comments

comments icon

0

Share

Published:

November 15, 2018

Country:

,

Comments:

comments icon

0

Share

Slovenia-based Resalta, a leading energy service company (ESCO) in South-East Europe (SEE), has recently completed a project for Serdika Center in Sofia, one of the largest shopping malls in Bulgaria. Resalta has modernized the center’s energy monitoring system, significantly improving Serdika’s ability to control its energy consumption, the ESCO said in a press release.

Serdika Center has over 210 stores and restaurants and is qualified as a sustainable building. Resalta has helped resolve issues with the obsolete energy monitoring system (EMS), in operation since the mall’s opening. The old EMS was suboptimal, time-consuming when it came to data collection and analyses, and thus could not meet the management’s requirements to enable well-informed decisions for performance improvement.

Resalta implemented solutions that address these requirements directly. In doing so, Resalta became one of the first companies to install Schneider Electric’s newest state-of-the-art EMS – EcoStruxure Power Monitoring Expert 9.0 – which through its advanced power quality analysis ensures reliable network operation, better equipment performance, improved tracking and better reporting.

The system brings capabilities that make it simpler to keep operations running, protect people and assets and at the same time save time and money.

The innovative features of the EMS include:

  • the most advanced energy visualization for calculation, modelling, forecasting and tracking main energy performance indicators;
  • alarm management with smart events and alarms clustering for intuitive and powerful filtering as well as timeline analysis tools defining alarms’ sequence, location and impact.

Applied energy monitoring system one of largest in Bulgaria

Project implementation was completed within a month and involved the measurement of more than 250 existing electricity meters, some of which were substituted with new ones.

The applied energy monitoring system is one of the largest in Bulgaria.

It is designed to allow for expansion of the connections in the future, if needed. The integrated measures will save time and human resources for the client while providing accurate, timely and comprehensive information on all energy consumption for better decision-making processes.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

Green for Growth Fund financial impact targets 2023

Green for Growth Fund tops its financial, impact targets in 2023

15 July 2024 - The Green for Growth Fund kept mitigating climate change and promoting sustainable economic growth last year in its 18 markets

Heat pumps and electric cars expected to bring small rise in power demand for Greece

Heat pumps, electric cars expected to contribute little to power demand growth in Greece

10 July 2024 - Contrary to earlier estimates, heat pumps and electric cars are not expected to significantly raise electricity demand in Greece.

vinca beo cista energija waste to energy facility

Beo Čista Energija officially starts producing energy from waste at Vinča landfill in Belgrade

03 July 2024 - Beo Čista Energija started the waste incineration in February 2023 as a final phase of testing its waste-to-energy facility

Zoran Lajovic Metalfe Group

Green Steel from Sremska Mitrovica – responsible industry for sustainable future

24 June 2024 - Serbian company Metalfer Group, whose production portfolio includes the so-called Metalfer® Green Steel, has demonstrated that steelmaking can be sustainable and responsible