Electricity

Republic of Srpska breaks ground on three hydropower plants on Bistrica river

three-hydropower-plants-bistrica

Photo: Pixabay/JillWellington

Published

December 29, 2021

Comments

comments icon

0

Share

Published:

December 29, 2021

Comments:

comments icon

0

Share

The Republic of Srpska has held a groundbreaking ceremony for the construction of three hydropower plants on the Bistrica river, with a total installed capacity of 39 MW. The contractor on the project, valued at EUR 103 million, is AVIC-ENG – China National Aero-technology International Engineering Corp.

All three hydropower plants are expected to go online in four years at the latest, with a projected annual electricity production of 152 GWh.

Of note, according to an earlier application for a preliminary environmental impact assessment, the combined installed capacity of the three cascading power plants is to be 36.1 MW, with an annual output of 134.5 GWh.

All three hydropower plants are expected to go online in four years at the latest

The project is implemented by a firm called Hidroelektrane Bistrica, controlled by the Republic of Srpska’s state power utility, Elektroprivreda Republike Srpske (ERS).

ERS is preparing to issue bonds on the Vienna Stock Exchange to raise funds for Bistrica and other projects

ERS was given the green light this month to issue bonds on the Vienna Stock Exchange in January to raise funds for Bistrica and other projects, in what will be the first such move among state-owned energy companies in the region.

Earlier this year, ERS failed to secure a EUR 68.7 million loan for the Bistrica project, when it also sought a EUR 50 million loan to finance the completion of 160 MW hydropower plant Dabar.

Serbia’s EPS has launched a project to build pumped-storage hydropower plant Bistrica

On the Serbian side of the border, state power utility Elektroprivreda Srbije (EPS) announced a tender earlier in December to develop a preliminary design and feasibility study for the construction of a pumped-storage hydropower plant (RHE) also called Bistrica. The deadline to submit bids is January 28.

EPS already has one such hydropower plant – RHE Bajina Bašta, and RHE Bistrica would be similar. According to the tender documentation, RHE Bistrica would have four Frances-type units with a nominal (output) turbine capacity of 157.1 MW and a maximum (input) pump capacity of 167.9 MW. The Bistrica pumped-storage plant would be located near EPS’s existing hydropower plant Bistrica.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

Trump scraps US climate policy blocks offshore wind exits Paris Agreement

Trump scraps US climate policy, blocks offshore wind, exits Paris Agreement

21 January 2025 - President Donald Trump substantially reversed the US energy and climate policy. He is withdrawing the country from the Paris Agreement again.

Hungary suffers highest cross-border electricity price volatility spillovers in EU

21 January 2025 - IMF has examined wholesale electricity price volatility and its spillover effects across 24 countries in the European Union

Trump declaring energy emergency Drill baby drill

Trump declaring energy emergency to ‘Drill, baby, drill’

20 January 2025 - In his inauguration address, United States President Donald Trump vowed to bring energy prices down, with an emphasis on raising oil and gas production

serbia azerbaijan gas power plant nis memorandum eps srbijagas dubravka djedovic

Serbia to sign gas power plant memorandum with Azerbaijan

20 January 2025 - Dubravka Đedović Handanović spoke about a gas power plant project in Serbia with Deputy Minister of Economy of Azerbaijan Anar Akhundov