Electricity

Promises for coal jobs in southeastern Europe greatly exaggerated – study

Photo: Pexels

Published

June 29, 2018

Country

Comments

comments icon

0

Share

Published:

June 29, 2018

Country:

Comments:

comments icon

0

Share

Proponents of coal have overall claimed that 10,030 jobs would be maintained and 17,600 new jobs created, while according to new analysis a reduction of workplaces by around 5,170 is more likely, CEE Bankwatch Network said in a press release.

A study The great coal jobs fraud covering eight southeast European countries – Bosnia and Herzegovina, Bulgaria, Greece, Kosovo*, Macedonia, Montenegro, Romania and Serbia, finds that claims the coal industry will create or maintain tens of thousands of jobs in the region – a key argument used to justify building new coal units or prolonging the life of unprofitable, old and polluting ones – are greatly exaggerated, a statement by Bankwatch reads.

This study, an update of Bankwatch’s November 2016 analysis, finds that even the current levels of employment cannot be maintained and some companies such as public power utilities Elektroprivreda Srbije (EPS) and the Pljevlja coal mine in Montenegro have already begun reducing their workforce, Bankwatch said, adding that a fair and inclusive plan is urgently needed to transform coal-dependent communities.

As part of its ongoing restructuring programme, Elektroprivreda Srbije needs to reduce the number of workers overall but there is very little information about this publicly available, the study finds. It is very unlikely that there will be an overall increase in jobs if Kostolac B3 power plant is built as this will merely offset some of the jobs lost in the wider company, the analysis notes.

“Overstaffed coal mines”

The planned 500 MW Kosova e Re  is the regional prize winner in terms of exaggerated employment claims, Bankwatch said in a statement.

Media statements by the concessionaire suggest that 10,000 jobs would be created during the construction phase and 500 during operation, yet the analysis shows that no more than 1,200 workers should be required during the construction stage – and many of them are likely to be imported specialists – while no more than 190 should be required during operation, press release by Bankwatch reads.

According to Bankwatch study, overstaffed coal mines in the region will see large reductions in employee numbers whether new coal power plants are built or not.

“Governments in the region which pretend the coal industry can be kept afloat are merely deceiving people. The industry is dying and the promises of job creation are keeping workers and communities trapped into an altered reality,” says Ioana Ciuta, Bankwatch energy coordinator and co-author of the study.

“Meanwhile, employment in renewables has reached 1.5 million in the EU alone and it’s growing.”

* This designation is without prejudice to positions on status and is in line with UNSCR 1244/99 and the ICJ Opinion on the Kosovo declaration of independence.
Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

serbia solar wind 2025 projections

Serbia to add 138 MW in solar, wind in 2025

21 February 2025 - The estimated capacity of prosumers is 123.6 MW, out of which 43 MW would be new photovoltaics, according to the energy balance

Energy industry confidence in net-zero goals sinks EIC report

Energy industry confidence in net zero goals sinks – report

21 February 2025 - Energy industry confidence in reaching net zero targets is fading, according to Net Zero Jeopardy Report II by the Energy Industries Council

EU renewables role Vision for Agriculture and Food

EU acknowledges renewables role in Vision for Agriculture and Food

21 February 2025 - Green energy and energy communities are beneficial for farmers, the European Commission said in its Vision for Agriculture and Food

Kosovo four applications wind power auction

Kosovo* receives four applications for wind power auction

21 February 2025 - German, Kosovar, French and Turkish companies submitted documentation to qualify for the first wind power auction in Kosovo*