Renewables

New buildings in Berlin must have solar rooftops from 2023

New buildings in Berlin must have solar rooftops from 2023

Photo: Moerschy from Pixabay

Published

June 22, 2021

Country

Comments

comments icon

0

Share

Published:

June 22, 2021

Country:

Comments:

comments icon

0

Share

The state parliament of Berlin passed a law that imposes an obligation on private owners of all new buildings and of those that undergo significant roof renovation to install photovoltaic systems. The rule comes into force at the beginning of 2023.

After many months of discussions, the House of Representatives in Berlin adopted the regulation that paves the way for the German city-state to reach a share of solar power in its electricity consumption of 25% as soon as possible. Photovoltaic systems will have to cover at least 30% of the roof area of all new buildings with a usable area of more than 50 square meters, starting from 2023.

The local law applies to all major roof refurbishments as well. The local authorities are also pushing for a phaseout of hard coal by 2030. Lignite was abandoned in 2017.

Façade installations, solar thermal panels provided as alternative

The minimum standard for solar roofs in residential buildings is 2 kW for one or two households, 3 kW for three to five units and 6 kW for six to ten apartments. The law covers the nonresidential sector, too.

It allows the possibility of installing solar thermal panels or a solar power system on the façade and exemptions were made for historic buildings where the project is technically impossible and for roofs facing north.

New rule comes with hefty fines

The new rules include fines of EUR 5,000 to EUR 25,000 for residential buildings and up to EUR 50,000 for the nonresidential sector.

Critics in the local parliament said the regulation puts a disproportionately high burden on owners of single-family houses and small businesses. An analysis showed 58% of the solar potential in Germany’s capital city is in residential buildings compared to 32% in commercial buildings and 9% in public structures.

In other news, the House of Representatives approved the acquisition of the city’s power grid operator Stromnetz Berlin from Vattenfall.

The Senate of Berlin passed a decision aimed at launching a building renovation program in July with Investitionsbank Berlin’s funds. Subsidies range from 15% to 40% of eligible costs.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

projects euros modernisation fund celan energy

EU’s Modernisation Fund disburses EUR 3.66 billion for clean energy projects in nine countries

04 July 2025 - Focusing on renewables, grids, storage, and energy efficiency, the funds will support projects in Croatia, Slovenia, Greece, and Romania.

marta kos growth plan western balkans skopje

Clean energy, grid upgrade projects in Western Balkans to be backed under EU’s Growth Plan

02 July 2025 - The European Commission has proposed the first support package, worth EUR 87.7 million, under the Growth Plan for the Western Balkans.

Igor Andjelkovic Country Lead Serbia Hitachi Energy

Hitachi Energy: Game-changing solutions for a sustainable energy future

25 June 2025 - With its system solutions, products, and services, Hitachi Energy contributes to sustainable energy and a better future, Igor Anđelković said at BEF 2025.

slovenia smart grids investments distribution grid

Slovenia’s EUR 150 million smart grid leap

18 June 2025 - The five electricity distribution firms in Slovenia will invest more than EUR 150 million by the end of March 2026