Renewables

Margün Energy takes over licenses for potential 505 MW in geothermal power plants

Margun Energy licenses potential 505 MW geothermal power plants

Photo: iStock

Published

October 30, 2025

Country

Comments

comments icon

0

Share

Published:

October 30, 2025

Country:

Comments:

comments icon

0

Share

Turkish contractor and solar power plant operator Margün Energy, which is expanding to geothermal energy including lithium extraction, acquired nine geothermal licenses that enable access to a potential power production capacity of 505 MW. It counts on USD 405 million per year from electricity sales alone.

Margün Energy, listed at the Istanbul Stock Exchange since 2021, said it would establish a subsidiary called Margün Jeotermal. It would be responsible for nine geothermal licenses in the provinces of Denizli, in southwestern Turkey, and Manisa, in the west.

The company said it is targeting 3.86 TWh in annual electricity output upon completing the investments. In a regulatory filing, Margün Energy revealed that it conducted the transaction through its fully-owned subsidiary Bosphorus Yenilenebilir Enerji, which would own 77.5% of the new business.

Having a potential new power production capacity of 505 MW overall, the company counts on USD 405 million in sales. It translates to an annual earnings before interest, tax, depreciation and amortization of USD 324 million, it added.ž

Turkey is the fourth in the world in geothermal power capacity.

The company mostly operates solar power plants and works as a contractor for engineering, procurement and construction (EPC) and operations and maintenance.

Notably, it owns the largest stake in Enda Energy Holding. The affiliate operates four hydropower plants, five wind power plants, one geothermal power plant and three solar power plants of 200 MW altogether.

Margün Energy intends to search for lithium in geothermal waters in Seferihisar in western Turkey, where it took over a 12 MW geothermal power plant earlier this year. It also launched a project to add a photovoltaic unit of 5.4 MW to the existing facility and create a hybrid power plant.

Turkey is the fourth in the world in geothermal power capacity.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

serbia edf france nuclear energy memoradnum dimovic

Serbia’s Vinča Institute, EDF to cooperate in nuclear energy

17 November 2025 - The memorandum of cooperation establishes a framework for scientific, technological, and educational cooperation in nuclear energy

Udruzivanje energetske zajednice smanjuje troskove trziste elektricne energije

Energy communities reduce power bills for members, improve electricity market

17 November 2025 - Energy communities of citizens are greening energy and they benefit society at a local level, according to participants in an event organized by Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH

gen i sunotec slovenia bulgaria bess Igor Koprivnikar Kaloyan Velichkov

GEN-I, Sunotec ink deal on 200 MW BESS management

14 November 2025 - Slovenian GEN-I and Sofia-based Sunotec established cooperation in the energy storage sector

germany bess projects bnetza

Germany gets applications for 661 GWh of BESS projects

13 November 2025 - Currently, 921 large-scale batteries are in operation. They have a storage capacity of about 3.2 GWh altogether