Renewables

Hidroelectrica, Masdar to set up joint venture for 2 GW in Romania

Hidroelectrica Masdar joint venture 2 GW Romania

Photo: Sebastian Burduja / Facebook

Published

April 19, 2024

Country

Comments

0

Share

Published:

April 19, 2024

Country:

Comments:

0

Share

The joint venture partnership between Romanian hydropower plant operator Hidroelectrica and Masdar from the UAE is taking shape. They agreed to establish a company to invest more than EUR 1.5 billion in the next three years in photovoltaic plants, floating solar power systems on dam reservoirs and battery storage.

Prime Minister of Romania Marcel Ciolacu visited Abu Dhabi with a group of ministers and the leadership of several state institutions and government-controlled companies. Building on a joint venture partnership established a year ago, Hidroelectrica and Abu Dhabi Future Energy Co. – Masdar agreed to launch investments of more than EUR 1.5 billion in solar power and battery energy storage systems, Minister of Energy Sebastian Burduja said.

The two companies decided to develop both onshore and floating solar power projects together, according to the Romanian state-owned hydropower plant operator. Hidroelectrica revealed that the partnership with Masdar became exclusive, for at least three years.

It can be extended if, within the period, the joint venture proposes final investment decisions (FID) for a total of at least 2 GW in greenfield or brownfield projects, the Romanian utility added. Burduja said the firm would be registered by the end of June.

First joint investment to be in floating power plants on Olt river

Additionally, the partners agreed they can explore opportunities in the onshore and offshore wind power segments as well as outside Romania.

President of the Board of Hidroelectrica Károly Borbély, who led its delegation, said the joint venture would be equally owned and that the first investment with Masdar would be in a pilot project for floating solar power plants on seven reservoirs in the middle and downstream sections of the Olt river.

Hidroelectrica has 187 hydropower plants with 6.3 GW in combined capacity. It also operates the 108 MW Crucea wind farm. The utility said it holds a 13.1% share in power supply in Romania.

Masdar to participate in Belgrade Energy Forum

Masdar is owned by Abu Dhabi National Energy Co. (Taqa), Mubadala Investment Co. (Mubadala) and Abu Dhabi National Oil Co. (Adnoc). It has almost 15 GW worldwide in green energy facilities in operation and development.

The company is scheduled to participate in the upcoming Belgrade Energy Forum 2024 on May 13-14 in Serbia’s capital. In Southeastern Europe, Masdar is also active through the Masdar Taaleri joint venture. It won a market premium in August for its Čibuk 2 project in Serbia at the country’s first wind power auction.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

Japan Bistrica pumped storage hydropower project JICA Serbia

Japan approves participation in Bistrica pumped storage hydropower project in Serbia

08 May 2024 - Japan has formalized the participation of state agency JICA in the Bistrica pumped storage hydropower project in Serbia

shell energy europe cropex guarantees of origin

Shell Energy Europe to participate in guarantees of origin auctions in Croatia

08 May 2024 - Shell Energy Europe Limited and 3Degrees Group Inc. have registered for participation in auctions for guarantees of origin at CROPEX

Renewables record 30 global electricity 2023 growth solar wind Ember

Solar, wind push renewables to record 30% global electricity share

08 May 2024 - Renewables generated a record 30% of global electricity in 2023, driven by growth in solar and wind, Ember said in an annual report

AAE gamit slovenia Energie AG wind solar

Energie AG acquires stake in Slovenian wind, solar developer

08 May 2024 - Energie AG aims to develop wind farms and photovoltaic parks in Slovenia with a total capacity of more than 180 MW