Renewables

EPCG to install two solar power plants at HPP Perućica dams

EPCG to install two solar power plants at HPP Perucica dams

HPP Perućica (photo: EPCG)

Published

December 10, 2021

Country

Comments

0

Share

Published:

December 10, 2021

Country:

Comments:

0

Share

Power utility Elektroprivreda Crne Gore (EPCG) has initiated the procedure of installing two solar power plants at dams at hydropower plant Perućica. The power plants will have a total capacity of 3.7 MW.

Installing solar power plants on dams or land near the lakes of existing hydropower plants is a practice used by many energy companies along with the energy transition in the region tracked by the Balkan Green Energy News portal. Such projects are being developed by Elektroprivreda Republike Srpske (ERS) from BiH, Dravske Elektrarne Maribor from Slovenia, KESH from Albania, Hidroelectrica from Romania, Elektroprivreda Srbije (EPS) from Serbia, while some projects have already been completed in Turkey.

EPCG has announced a tender to develop the preliminary design of solar power plants with connecting cables and substations on the Slano and Vrtac dams. These are dams of the HPP Perućica, the power plant with the largest installed capacity in Montenegro – 307 MW.

Dams offer a number of advantages for the installation of solar power plants

The Slano dam solar power plant, with a capacity of 2.2 MW, and the Vrtac Dam solar power plant, with a capacity of 1.5 MW, are planned to be built on the downstream slopes of the Slano and Vrtac reservoirs, according to the tender documentation.

According to EPCG, the advantages of dams for the installation of the photovoltaic power plants include a large, relatively flat area owned by EPCG, favorable conditions for connection to the grid, easy access to water for washing panels, and the creation of conditions for the construction of small hydropower plant Slano.

Some of these advantages, especially land and the conditions for a grid connection, could save time and money in developing every solar project. The combination of solar and hydro through hybrid systems is also recognized as a solution for the variability of both energy sources.

EPCG also wants to install a floating solar power plant on its lakes

According to the tender documentation, the deadline for submitting bids is December 15.

Of note, in addition to the construction of solar power plants on dams and land near the lakes of existing HPPs, companies are also installing floating power plants on these reservoirs. Statkraft has already built a floating solar power plant in Albania, and KESH is developing a project.

EPCG intends to do the same on the Slano lake within the Perućica HPP system.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

Construction of first large solar power plant in BiH kicks off

27 May 2022 - The facility will be located in the southern municipality of Grude, 20 kilometers from the Adriatic Sea and 50 kilometers from Mostar

Wind solar save Turkey amazing USD 7 billion 12 months

Wind, solar save Turkey amazing USD 7 billion in last 12 months

27 May 2022 - Wind and solar power plants saved Turkey USD 7 billion over the last 12 months as it would have had to compensate for the shortfall with gas imports

Romania EUR 1 4 billion European funds grid solar gas

Romania to invest EU funds of over EUR 1.4 billion in grid, solar power, gas plants

27 May 2022 - The EU allowed Romania to use its share of the Modernisation Fund for the makeover of coal plant owner CE Oltenia and the electricity grid

guarantees-of-origin-energy-community-registries

Guarantees of origin scheme ready to go live in Energy Community markets

26 May 2022 - All that is left to do is for the national issuing bodies to sign agreements with energy certificate registry provider Grexel, says Naida Taso