Electricity

Bulgarian IBEX to roll out 15-minute interval for power delivery in October

Bulgarian IBEX 15 minute interval power delivery October

Photo: Piotr Zakrzewski from Pixabay

Published

July 13, 2022

Country

,

Comments

0

Share

Published:

July 13, 2022

Country:

,

Comments:

0

Share

The Independent Bulgarian Energy Exchange will introduce a 15-minute product within the intraday electricity market for the Bulgarian-Romanian border on October 1, its Chief Executive Officer Konstantin Konstantinov said.

According to the European Union’s rules, Bulgaria’s Electricity System Operator or ESO has to facilitate the introduction of a 15-minute imbalance settlement period, CEO of the Independent Bulgarian Energy Exchange (IBEX) Konstantin Konstantinov noted in an interview with 3E-news.net. The testing for the introduction of the system within the intraday market segment, together with 15-minute products, has started last month.

Konstantinov revealed that IBEX would introduce an intraday product with a 15-minute delivery interval on October 1 for the Bulgarian-Romanian border. The exchange’s CEO stressed the hour-by-hour system for trading and settlement would continue to operate.

He expressed hope that a single price would be introduced for balancing energy, which has a role to stabilize the system when unplanned fluctuations occur. Renewables like solar and wind power depend on the weather, and it often rapidly changes, so such markets are necessary to help equalize supply and demand.

Konstantinov: Market coupling with Greece in the intraday segment should be completed by the end of the year

IBEX has another important project. Konstantinov said market coupling with Greece in the intraday segment should be completed in the next quarter and that it would integrate his country with the EU.

As market participants get access to a wider area, power prices should become less volatile, but the volume of information necessary to be processed is also increasing.

Turning to the day-ahead market on IBEX, Konstantinov said there are already more than one hundred participants. Most are active on a daily basis both in the Bulgarian market and the entire Central and Southeastern European region, he underscored.

The Bulgarian-Romanian transmission capacity is 2 GW in both directions, Konstantinov asserted.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

Construction works start Bulgaria first hybrid power plant

Construction works start on Bulgaria’s first hybrid power plant

20 September 2023 - The Tenevo hybrid power plant, the first in Bulgaria, will consist of a solar and wind power plant and a battery storage system

marko bislimoski rke energy transition north macedonia

Bislimoski: Energy transition to make North Macedonia exporter of electricity

19 September 2023 - North Macedonia has increased its electricity generation capacity by 30%, according to Marko Bislimoski

Statkraft-pumped-storage-hydropower-plant-Moglica-1-6-GW-Albania

Statkraft plans pumped storage hydropower plant of up to 1.6 GW in Albania

19 September 2023 - Statkraft intends to expand its hydropower cascade on the Devoll river in southern Albania with pumped storage system RP Moglica Shtesë

Turkey-PV-units-115-MW-government-buildings

Turkish government to green its roofs with solar panels

19 September 2023 - Turkey will provide public buildings in nine provinces with small and mid-sized photovoltaic facilities for self-consumption