Environment

Bosnia and Herzegovina submits its third national report on climate change

Photo: Pixabay

Published

July 31, 2017

Comments

comments icon

0

Share

Published:

July 31, 2017

Comments:

comments icon

0

Share

Bosnia and Herzegovina has experienced several significant extreme climate episodes in the last five years and the temperature increase, while the energy sector is the most significant source of CO2 emissions, the country’s reports on climate change and greenhouse gas emissions show.

Bosnia and Herzegovina has recently finished the adoption procedure of the Third National Communication on Climate Change and the Second Biennial Update Report on Greenhouse Gas Emissions as they were adopted by the relevant institutions on both state and entities’ level, the Ministry of Spatial Planning, Civil Engineering and Ecology of the Republic of Srpska announced.

The reports has been submitted to the United Nations Framework Convention on Climate Change (UNFCCC) Secretariat in Bonn, the statement said.

Bosnia and Herzegovina, as the UNFCCC signatory, has an obligation to submit the National Communication on Climate Change every four years and the Report on Greenhouse Gas Emissions every two years.

The reports updates information on climate changes, greenhouse gas inventories, climate change mitigation, vulnerability to climate change and steps taken to adapt to climate change, as well as information on public awareness, education, training, systematic research, and technology transfer.

In the last five years Bosnia and Herzegovina has been facing with several significant extreme climate and weather episodes that have caused substantial material and financial deficits, as well as casualties, the reports show.

The two most important events are drought during 2012 and flooding during 2014, the UNDP Mission in Bosnia and Herzegovina explained in the statement. The project of the preparation of two reports was implemented by the UNDP and funded by the Global Environment Fund (GEF).

The increase in annual air temperature ranges from 0.4 to 1.0 degrees Celsius, while the increase in temperature during the growing season (April– September) even reaches 1,2 degrees Celsius. In the analyzed period, all indices of warm temperature extremes have positive trends, while indices of cold temperature extremes have negative trends.

The most significant source of CO2 emissions in Bosnia and Herzegovina is the energy sector, which in the 2002-2013 period contributed with about 53 percent of total CO2 emissions.

The agriculture contributed with 14 percent, industrial processes with 6 while the share of and waste is 5 percent. The share of emissions from other sectors in the total emissions during this period is about 22 percent, the findings show.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

Western Balkan coal plants cut harmful emissions 2024 breaches extreme

Western Balkan coal plants cut harmful emissions in 2024 but breaches remain extreme

19 June 2025 - SO2 emissions from NERP-bound coal plants in BiH, Kosovo*, North Macedonia and Serbia were six times above legal limits last year

serbia air quality ebrd loan sinisa mali sara pavkov Matteo Colangeli

Serbia secures EUR 50 million loan for air quality projects

12 June 2025 - The Government of Serbia has secured a EUR 50 million loan to be invested in a series of air quality protection projects

EU strategic status Rio Tinto lithium project fueling tensions Serbia

EU’s strategic status for Rio Tinto’s lithium project risks fueling tensions in Serbia

06 June 2025 - The addition of the planned lithium mine in Serbia to the EU's strategic projects for raw materials has again stirred up public controversy

European Commission Jadar project Serbia strategic projects critical raw materials

European Commission declares Jadar project in Serbia one of its strategic projects for critical raw materials

04 June 2025 - Rio Tinto's project Jadar in Serbia is now one of the EU's 13 strategic raw materials projects outside of its borders