Renewables

3Smart project to provide setup for energy management in Danube region

Photo: Pixabay

Published

January 19, 2017

Country

Comments

comments icon

0

Share

Published:

January 19, 2017

Country:

Comments:

comments icon

0

Share

The regional project ”Smart Building – Smart Grid – Smart City” (3Smart) has been officially launched. It aims to provide a technological and legislative setup for cross-spanning energy management of buildings, energy grids and major city infrastructures in several countries of the Danube region.

The 3Smart project includes the development of a modular platform for coordinated building and distribution grid energy management. The developed platform will be installed in five pilot locations in Croatia, Slovenia, Austria, Hungary and Bosnia and Herzegovina.

In addition, a comprehensive cost-benefit analysis will be performed to verify the platform’s performance and provide an optimal economic value of energy efficiency and renewable energy investment and optimized costs on the grid side to motivate the installation of distributed storages for improving energy security in the Danube region.

The project is funded by the European Union through the Interreg Danube Transnational Programme. As it is stated on the programme’s website, the countries in the Danube region have no regulatory or technology framework developed for inception of building-grid cross-spanning energy management schemes. When it comes to the integration of energy-efficiency measures and renewable energy, current tendencies are not followed by adequate interactions to enable cost-optimal operation of the building as a whole.

Distribution system operators (DSOs) are reluctant in allowing additional capacities of intermittent renewable energy in the grid as they engage investments into the grid and a costly reserve for secure operation. DSOs are interested in introducing coordinated energy exchange with prosumers through optimized price profiles for net energy exchange.

The lead partner on the project is University of Zagreb Faculty of Electrical Engineering and Computing, the Department of Control and Computer Engineering. Laboratory for Renewable Energy Systems (LARES), as a part of the department, is responsible for the project’s component dealing with buildings while Smart Grid Laboratory is responsible for the grid component.

The project partners are also companies, municipalities, institutions and organisations such as Hrvatska elektroprivreda, the municipalities of Idrija and  Strem, European Centre for Renewable Energy Güssing, Faculty of Mechanical Engineering, University of Belgrade, and Faculty of Mechanical Engineering and Computing, University of Mostar, among others.

Associated strategic partners participating in the project are Croatian Energy Regulatory Agency, Regulatory Commission for Energy in Federation of Bosnia and Herzegovina and Hungarian Energy and Public Utility Regulatory Authority.

Regulatory energy agencies and ministries, DSOs and suppliers, local authorities and regional energy agencies are identified as main target groups. The 3Smart project will be implemented in the following two years.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

district heating decarbonization Wärtsilä chp engines heat power

District heating delivers affordable, flexible decarbonized energy – study

20 November 2024 - The authors have analyzed various revenue streams for combined heat and power generation, particularly combined heat and power engines

croatia necp renewables target 2030

Croatia raises 2030 renewables target to 42.5%

15 November 2024 - Croatia increased all the most important targets in its updated National Energy and Climate Plan for the period 2021-2030

montenegro ibrd locan energy efficiency distribution grid

Montenegro to invest EUR 34 million in energy renovation, distribution grid

07 November 2024 - Montenegro earmarked EUR 33.8 million for the energy efficiency of public buildings and modernization of the power distribution network

Albania obligatory zero emission standards solar panels buildings

Albania to roll out obligatory zero-emission standards, solar panels for buildings

06 November 2024 - Albania drafted a law on the energy performance of buildings including zero-emission and nearly zero-emission standards and solar energy use