Electricity

US firm Aalo starts construction of its first extra-modular nuclear reactor

us aalo smr extra modular idaho nuclear power

Photo: Aalo

Published

September 1, 2025

Country

Comments

comments icon

0

Share

Published:

September 1, 2025

Country:

Comments:

comments icon

0

Share

US-based nuclear power startup Aalo has begun construction on its first extra-modular reactor, a type of modular reactor, in Idaho. The company is among 11 developers of micro and small modular reactors selected by the US Department of Energy to participate in its Nuclear Reactor Pilot Program.

Aalo stated that its reactor will mark a significant milestone, becoming the first new sodium-cooled test reactor in the United States to go critical in over forty years—an achievement that builds on its selection for the Department of Energy’s pilot program.

The company noted that the lessons learned from manufacturing, shipping, installing, and licensing Aalo‑X will influence whether advanced reactors like the Aalo Pods can truly be produced at scale.

DOE’s aims to reach criticality for at least three advanced nuclear reactor concepts by July 4, 2026

“Within months, we will have assembled the first XMR at our Idaho site; by July 4, 2026, we will reach criticality, and by July 2027, we will power a collocated datacenter, with next-generation AI chips. Once operational, Aalo‑X will be a tangible proof‑of‑concept that nuclear energy can power the AI revolution rapidly and cost‑effectively,” the firm said in a press release.

us aalo smr extra modular idaho nuclear energy
Photo: Aalo

DOE’s Nuclear Reactor Pilot Program aims to reach criticality for at least three advanced nuclear reactor concepts located outside of the national laboratories by July 4, 2026.

Groundbreaking in the desert beside Idaho National Laboratory (INL) ensures that Aalo‑X will meet that mandate, the firm said.

According to Aalo, traditional categories of microreactors (<10 MWe) and small modular reactors (SMRs, up to ~300 MWe) leave a gap between tiny reactors that can be delivered to remote sites and larger units that supply cities.

Introducing the first XMR

“We created the extra‑modular reactor (XMR) to fill that gap. It’s a category of modular reactors that is a crossover between microreactors and SMRs. Our product is an Aalo Pod that contains five 10 MWe Aalo‑1 reactors arranged around a single turbine; the resulting 50 MWe plant is purpose-built for power‑hungry data centers,” according to the press release.

The concept of SMR has been gaining traction worldwide for quite a while, as part of a nuclear energy renaissance. However, overall progress in the sector has been modest.

The world’s first SMR-based facility, Russia’s floating nuclear power plant Akademik Lomonosov, commissioned in Chukotka in 2020, remains the only one in commercial operation.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

Bistrica study pumped storage eps

Serbia moves closer to building Bistrica pumped storage hydropower plant

24 April 2026 - The construction of Bistrica will provide 55 GWh of energy storage capacity and enable the integration of 1.5 GW of renewables

serbia region eu energy community mou balkan green energy news lorkowski jovicic

Energy Community Secretariat, Balkan Green Energy News sign MoU to advance clean energy awareness across Balkans

24 April 2026 - The MoU outlines the framework for collaboration, ensuring accurate, timely, and balanced reporting while upholding the media's independence

bih republic of srpska dso elektrokrajina distribution grid loan ebrd

BiH’s DSO Elektrokrajina to invest EUR 30 million in distribution grid

24 April 2026 - The Council of Ministers of BiH has approved an initiative to begin negotiations for a loan aimed at upgrading the distribution grid

Serbia’s TSO EMS inks deal to invest EUR 36 million in substations

24 April 2026 - Works on substations in Bajina Bašta and Obrenovac are part of the third section of the Trans-Balkan Corridor for electricity transmission