Renewables

Greece schedules first auction for guarantees of origin

Greece launches first auction for Guarantees of Origin

Photo: geralt on Pixabay

Published

May 6, 2024

Country

Comments

comments icon

0

Share

Published:

May 6, 2024

Country:

Comments:

comments icon

0

Share

Greece’s Renewable Energy Sources Operator and Guarantees of Origin, DAPEEP, said the country’s first auction for guarantees of origin would take place on June 26.

Guarantees of origin or GOs are financial products certifying that a specific amount of power was produced from renewable energy sources and not fossil fuels.

Originally, the first auction was to take place in January 2024, but it was pushed back to June.

Three types of products will be offered and they all cover energy produced in the last quarter of 2023: solar and wind within the interconnected system and wind farms in non-interconnected islands.

DAPEEP: 4.44 TWh will be offered

According to DAPEEP’s head of GOs Maria Koulouvari, in 2023 guarantees were published for 22.4 TWh of renewable energy, out of which 4.44 TWh will be auctioned since the entirety of the year is not covered.

The starting price has been set at EUR 0.10 per MWh, down from EUR 0.50 per MWh originally planned, to ensure the success of the process given the fact that market prices have fallen recently.

According to DAPEEP’s plan, two more auctions are scheduled for 2024, with one on September 25 for energy produced in the first quarter of 2024 and another, on December 15, for the second quarter of this year.

Participants can already register for the upcoming first auction. The regulatory framework was earlier approved by the Regulatory Authority for Waste, Energy and Water (RAAEY).

The GOs will help Greek electricity suppliers attain the necessary renewables share in their mix for 2023. They are added to 28% of the demand already met with free GOs. However, imports are also needed: so far they have reached 1.38 TWh, according to Koulouvari.

Apart from suppliers, in recent years an increasing number of companies and institutions want to boost the share of renewables in their consumption or reach carbon neutrality, which requires verification through the GO market.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

eps hydropower plants output

Serbia’s hydropower output drops to all-time low amid drought

13 October 2025 - Electricity production at EPS's hydropower plants is set to hit a historic low this year due to unfavorable hydrological conditions

CWP Europe and the European Commission signed the Declaration

CWP Europe gets European Commission’s backing for renewables projects in Albania, Montenegro

13 October 2025 - CWP Europe and the European Commission have signed a declaration of support for the Tropoja wind farm and the Montechevo solar farm with battery storage

IPS International Power Supply inaugurates Bulgaria first battery gigafactory

International Power Supply inaugurates Bulgaria’s first battery gigafactory

13 October 2025 - International Power Supply (IPS) opened its Factory X1 on the outskirts of Sofia, with a capacity of 3 GWh per year

ie energy bess smart battery storage

Croatian IE-Energy, Slovenia’s NGEN plan virtual network of smart battery storage systems

10 October 2025 - The EUR 60 million project is a step toward creating a virtual network of battery storage systems connecting renewable energy producers and consumers.