Waste

Romania to subsidize construction of recycling facilities with EUR 220 million

romania recycling mircea fechet GreenGlass Recycling

Photo: Mircea Fechet /Facebook

Published

March 5, 2024

Country

Comments

comments icon

0

Share

Published:

March 5, 2024

Country:

Comments:

comments icon

0

Share

Romania will spend EUR 220 million in subsidies for the construction of 26 recycling facilities. The aim is to improve the waste management system and meet the national recycling targets.

The Ministry of Environment, Water and Forests approved funding for the construction of approximately 26 recycling facilities. The subsidy package worth EUR 220 million from the National Recovery and Resilience Plan (NRRP or, in Romanian, PNRR) is envisaged to cover up to 75% of individual investments.

Waste recyclers can receive up to EUR 8.4 million per recycling plant project, Minister of Environment, Water and Forests Mircea Fechet said.

He added Romania generates large amounts of municipal waste while that separate waste collection volumes and recycling rates are low. Out of the six million tons of waste each year, only 12% to 13% is recycled, Fechet stressed.

Over 80% of the waste generated in Romania ends up in landfills

Of note, Romania ranks 26th out of 27 European Union member states in recycling rates.

Over 80% of the waste generated, in the minister’s words, ends up in landfills. He called it a terrible result compared to the EU average of 20%.

The Romanian Government expects the recent introduction of a deposit return system for beverage packaging to improve the situation. The system has been operational since December 2023.

The projects must be implemented by June 30, 2026

According to Fechet, the plan is to collect eight billion drink containers every year, which means recycling facilities will be required. It is crucial to process such resources in Romania and not to allow them to be exported, the minister added. Recycling generates employment and investments, he said.

The selected projects will have to be completed no later than June 30, 2026.

The program was presented at the GreenGlass Recycling factory in the Bucharest suburb of Popeşti-Leorden.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

green steel electric vehicles study transport environment

Switching to green steel would add just EUR 8 per electric vehicle by 2040

11 July 2024 - Switching to 40% green steel would add just EUR 57 to the sticker price of an electric vehicle in 2030, according to an analysis by T&E

vinca beo cista energija waste to energy facility

Beo Čista Energija officially starts producing energy from waste at Vinča landfill in Belgrade

03 July 2024 - Beo Čista Energija started the waste incineration in February 2023 as a final phase of testing its waste-to-energy facility

co2 is co2 zero waste europe calls for including incineration in eu ets

CO2 is CO2: Zero Waste Europe calls for including incineration in EU ETS

25 June 2024 - Incinerators are poised to become the most carbon-intensive power source once coal is phased out, claims Zero Waste Europe

French firms to build, operate Belgrade’s first wastewater plant

French firms to build, operate Belgrade’s first wastewater plant

24 June 2024 - The large-scale wastewater plant in Veliko Selo would help preserve the water quality and biodiversity of the Danube and Sava rivers