Renewables

First facility for production of hydrogen in Croatia to be installed in Križevci

krizevci hydrogen dok-ing waste

Photo: Križevačko Komunalno Poduzeće

Published

January 17, 2024

Country

Comments

0

Share

Published:

January 17, 2024

Country:

Comments:

0

Share

The first pilot facility for the production of hydrogen in Croatia is set to be built in Križevci, a town northeast of the country’s capital Zagreb.

Križevci is the leader of sustainable development and energy transition among the local municipalities not just in Croatia, but in the region of Southeast Europe.

The hydrogen project is being implemented by Dok-Ing from Zagreb and municipal waste management utility Križevačko Komunalno Poduzeće, Podravski.hr reported. The former reached an advanced stage in the construction of a prototype facility that would use municipal waste and sludge from wastewater treatment.

Three types of waste will be used as raw material

The two firms have agreed to transport the facility from Zagreb to Križevci. it will be operated by Križevačko Komunalno Poduzeće.

Martin Kozjak, CEO of the utility, said the permit they obtained envisages a waste processing pilot project in cooperation with the company Indeloop, part of Dok-Ing group. The facility will be located at the waste separation site. Non-recyclable waste, wood waste and mixed municipal waste will be the raw materials.

With the pilot project, the municipal firm wants to contribute to solving the issue of waste disposal in the most environmentally friendly way possible, he stressed.

Kozjak added it is important there wouldn’t be any harmful emissions from the facility.

The facility will use pyrolysis and the authorities claim that there will be no harmful emissions

The facility will use pyrolysis, the article adds. It is a process in which all organic waste and hydrocarbon-based compounds including plastisc can be used. It is not incineration, because it doesn’t involve oxygen, but waste treatment at 1,500 degrees Celsius. Pyrolysis turns waste into a gas, which represents a form of recycling, and hydrogen is obtained.

Of note, Croatia also has another innovative project for hydrogen production. It is under development by energy firm E.ON Croatia.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

energy-transition-partisan-not-global-issue

Energy transition is no partisan issue but global one

14 May 2024 - Representatives of companies with large renewable energy portfolios in Southeast Europe emphasized at Belgrade Energy Forum the critical importance of modernization, infrastructural development, and enhanced knowledge at the local level

succesful-first-part-of-energy-transition-balkans

Successful first phase of energy transition in Balkans, especially Serbia

13 May 2024 - The first phase of the transition to renewable energy sources in the Western Balkans has been successful, particularly in Serbia, according to Belgrade Energy Forum 2024, organized by Balkan Green Energy News

Belgrade-Energy-Forum-Dubravka-Dedovic-Handanovic

Belgrade Energy Forum – energy transition in Southeast Europe is accelerating

13 May 2024 - The Western Balkans would gain a strategic advantage by joining the EU’s single electricity market, Energy Community Secretariat Director Artur Lorkowski said at the opening of BEF 2024

DJokic-new-energy-capacities-2030

Đokić: Republic of Srpska to build 1,200 MW of new energy facilities by 2030

13 May 2024 - The Republic of Srpska plans to build 1,200 MW of new energy facilities by 2030, said Energy and Mining Minister Petar Đokić, adding that the Bileća solar power plant has been completed