Renewables

China, EU hope to make renewables tech recyclable in next decade

wind-turbine-recycling-renewables

Photo: Pexels

Published

August 22, 2023

Country

Comments

comments icon

0

Share

Published:

August 22, 2023

Country:

Comments:

comments icon

0

Share

As the life cycle of millions of tons of existing renewable energy equipment is about to end, China is working on solutions to recycle old wind turbines and solar panels and is hoping to have a recycling scheme in place by 2030. At the same time, European companies are developing technologies to fully recycle wind turbines, while battery recycling is projected to become profitable and sustainable by 2035.

Waste from decommissioned wind and solar facilities usually ends up in landfills, and inadequate recycling is one of the arguments often used by renewable energy critics.

Chinese institutions have now announced that new rules and standards on how to dismantle and recycle wind and solar facilities will be drawn up, according to a report by Recharge. They are hoping the system will be “basically mature” by 2030.

The scheme will involve rules for dismantling and recycling wind and solar plants

Many of China’s solar panels and wind turbines were installed in the early 2000s, and the lifecycle of this equipment is usually about 20-25 years. According to projections, the country will need to recycle 1.5 million metric tons of solar panels by 2030, and as much as 20 million tons by 2050, Recharge reported.

China will need to recycle 20 million tons of solar panels by 2050

By 2040, China is expected to have around 250 GW of photovoltaic modules and 280 GW of wind turbines that need decommissioning.

China is the world’s largest user and manufacturer of renewable energy equipment. According to Recharge, it has some 1,161GW of installed capacity. It is estimated that the country’s wind and solar capacity will reach 3,300 GW by 2030.

Wind turbines are 85%-95% recyclable, but the recycling of blades is challenging because they are made of composite materials, according to a report by WindEurope.

European companies have made strides in the recycling of wind turbine blades

In Europe, Danish start-up Continuum Group claims it has developed the technology to fully recycle wind turbine blades, while Spanish company EnergyLOOP plans to install its innovative blade recycling plant as early as 2024.

Also in Denmark, wind turbine manufacturer Vestas has unveiled a chemical process capable of fully recycling existing blades.

At the same time, Siemens Gamesa has installed the world’s first offshore wind turbine with recyclable blades. The installation took place at German energy giant RWE’s Kaskasi offshore wind project in 2022.

The battery recycling market in the EU could grow to EUR 8 billion by 2035

When it comes to batteries, a report by strategy&, part of the PwC network, claims that their recycling is expected to become a profitable and sustainable business by 2035, with some EUR 8 billion in revenue and potential reduction in battery cost.

According to the report, more than EUR 2 billion is expected to be in invested into the EU recycling market by 2030, while handling further market growth through to 2035 will require an additional EUR 7 billion.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

Principia CfD backed battery storage facility in Greece

Principia builds CfD-backed battery storage facility in Greece

15 October 2025 - Principia built its first BESS in just six months. The Themelio facility in Chalkidiki in northern Greece has 49 MW in operating power.

Šahmanović: Second submarine cable line with Italy to be installed by 2031

15 October 2025 - Minister of Energy and Mining Admir Šahmanović announced an investment at the EU-Montenegro Investment Conference

Romanian company geothermal hydroponic greenhouses 50 hectares

Romanian company to build geothermal hydroponic greenhouses on 50 hectares

15 October 2025 - Geothermal well developer and operator Green Tech International started the construction of a geothermal hydroponic greenhouse in Romania

montenegro eu investment conference alcazar calderon bijela

Alcazar Energy plans to boost its Montenegro investments to USD 500 million

14 October 2025 - Alcazar Energy intends to increase its investments in Montenegro from USD 200 million to USD 500 million, says Daniel Calderon