Electricity

Greece presents plan to export green energy to Europe through Western Balkans

western balkans

Photo: jplenio on Pixabay

Published

March 23, 2023

Country

Comments

comments icon

0

Share

Published:

March 23, 2023

Country:

Comments:

comments icon

0

Share

Greek Prime Minister Kyriakos Mitsotakis floated a plan to export renewable electricity from his country, Bulgaria and Africa to Europe through new interconnections, with a focus on the Western Balkans.

Greece’s new initiative to transfer electricity from renewable sources through the Western Balkans was presented today at a European summit. It involves the construction of onshore and offshore interconnections in the wider region.

It should be noted that Greece already has more planned renewable energy projects than it needs to cover its goal for 2030. According to the country’s latest National Energy and Climate Plan (NECP), about 15 GW of new renewables is going to be installed before the end of the decade. However, producer certificates are about to reach 100 GW.

It means both investors and the government are interested in exporting surplus energy to other European countries, both in the Balkans and beyond. It includes other producers in countries such as Bulgaria and Romania that will be able to take advantage of the interconnections.

New interconnections to run through Western Balkans

The government in Athens focuses on interconnection projects such as the Euroasia Interconnector (Israel-Cyprus-Greece), GAP and GREGY (Egypt-Greece) as well on upgrading existing links to Albania, Bulgaria and Italy.

Specifically, the Greek plan aims at a 3 GW corridor from Greece to Albania, which can be upgraded to 9 GW in the future. From Albania, Greece’s Independent Power Transmission Operator (IPTO or Admie) is examining two possible routes: one would be land-based, crossing Montenegro, Croatia and Slovenia to reach Austria and south Germany. The second route is offshore, from Albania’s coast to Slovenia and then to Austria and south Germany.

According to Mitsotakis, the new interconnectors need to reach the countries of the Western Balkans, where the development of renewables still lags behind the rest of Europe. Therefore, new connections can help these nations access green energy, as well as use their networks as an intermediary to transfer energy further north to Austria and Central Europe. According to the government in Athens, there are many financial and energy benefits for all sides .

Tsafos: Effort to gain political and financial support

According to the PM’s energy advisor Nikos Tsafos, the energy crisis has led to a redesign of the energy corridors in Europe. From now on, the East-West axis is less important and the North-South axis is highlighted. Greece will aim to invest in the new interconnections and gain support from the European Union, both politically and financially.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

Bistrica study pumped storage eps

Serbia moves closer to building Bistrica pumped storage hydropower plant

24 April 2026 - The construction of Bistrica will provide 55 GWh of energy storage capacity and enable the integration of 1.5 GW of renewables

serbia region eu energy community mou balkan green energy news lorkowski jovicic

Energy Community Secretariat, Balkan Green Energy News sign MoU to advance clean energy awareness across Balkans

24 April 2026 - The MoU outlines the framework for collaboration, ensuring accurate, timely, and balanced reporting while upholding the media's independence

bih republic of srpska dso elektrokrajina distribution grid loan ebrd

BiH’s DSO Elektrokrajina to invest EUR 30 million in distribution grid

24 April 2026 - The Council of Ministers of BiH has approved an initiative to begin negotiations for a loan aimed at upgrading the distribution grid

Serbia’s TSO EMS inks deal to invest EUR 36 million in substations

24 April 2026 - Works on substations in Bajina Bašta and Obrenovac are part of the third section of the Trans-Balkan Corridor for electricity transmission